Buenos Notches.

This week has been all about stringers and notching the frames accurately. The pre-formed notches are the minimum sizes, but need bevelling before a nice tight fit on the stringers and the stringers need sinking into the frames at the bow where the frame itself will lose a lot of material during the frame bevel process before planking.

Not much to say about this process, just some clamping, aligning, re-aligning and rasping (with a thin wood rasp) and sanding with a custom block that fits the notch has allowed some reasonable progress on this. Oh, and more rechecking of dimensions before drilling, countersinking and screwing the stringer in place.

I discovered that one side of the hull was 25mm longer than the other – almost identical to Pete B’s experience, and found (after much head scratching) that the stem wasn’t vertical and the transom pulled slightly out of true… Once i corrected this, the hull sides (stringer lengths) are within a few mm. Also i corrected minor bulkhead/frame location discrepancies between the sides, simply measuring the distance to each as I went along the hull before i screwed the stringers into place.

To avoid the whole assembly warping as i worked (the stringers sometimes require quite a lot of force to get them into position, so try to pull the frames out of line when released) i clamped and screwed the stringers in sequence, working on the same stringer on each side (i.e the upper chine one first) and working from the notch on the transom starboard side, the port, then the next frame on starboard, then port etc until i reached the bow. Basically trying to keep forces opposed to each other equal as i went along. Not sure how necessary it was, but it seems to have worked out ok.

The stringer assembly is now dry fitted apart from the top (bottom chine) stringer – the sheer clamps were in place before these photos were taken, but i came back to the shed one night and found both scarf joints had failed! I tracked the cause down to having used some resin with crystals in it. The damp in the shed and changes in temperatures during the thundery weather recently has affected the resin in the pump units on the cans and i must have used this in the mix. The epoxy had penetrated the wood fine, but the joint in the middle glue-to-glue had failed leaving a white powder or bloom in the joint. Fresh resin after rasping then sanding off the old stuff thoroughly seems to have worked, but I’m glad to have found this in such a small joint, having a large batch being affected (say, during planking) would have been much more difficult to deal with. I now know what to look out for. Once the new resin has had a chance to cure properly I will be in a position to screw them into place again.