Stern gland problems…

The boat went back into the water and I almost immediately discovered a problem with the stern gland, It got very hot, and I couldn’t get any water to leak out of it (as it is designed to do, in order to lubricate it). The stuffing box was made by Vetus, and didn’t have enough thread to tighten successfully with the correct number of packing rings (I used the kit supplied by vetus for that product) and when tightened with the correct amount of thread engaged on the packing nut it was simply too tight and got hot. Pretty basic engineering problems for a ‘proper’ marine engineering company’s product.

I’d had enough of messing around with products made by those purveyors of absolute rubbish marine products, so I bought a PSS (Packless Sealing System) made in the USA. We dried the boat out and fitted it in a few hours.

The PSS kit is brilliant. Complete with even a tiny tube of loctite it went on very smoothly and has worked a charm since.

My advice form this stressful episode? Never, ever, buy anything made by Vetus again. They simply do not make good enough products to be worth considering. Also the flax packing stuffing box? This tech was superceded in vicotrian times. Why the hell is it used nowadays i have no idea.

 

While the boat was dried out, we took the opportunity to remove the rudder, file down the rudder hinge pins and make the rudder a lot looser. Also I glassed in a piece of wood nearer to the prop to make the prop wash more effective when manouvering. Something that I have been meaning to do for ages!

I added some treadmaster on the companionway steps, changed a block that had worn through with poor rope angles and fit some new wooden blocks made by my dad and the jobs were completed!

 

Disaster!

Almost forgot to tell you about this – I’ve blanked it from my mind it was fairly unpleasant.

I was fitting the new bottom rudder hinge (with a hammer mind you) and the middle one fell apart…

Leaving the rudder hanging on by just the top one.

Which was awkward.

So, instead of simply fitting the new hinge and dropping the boat into the water, I had to remove the rudder entirely (its pretty heavy – about 100kgs I’d guess) and remove the middle one to get it rewelded.

The hinge was buried beneath two wooden ‘cheeks’ on either side of the rudder, so I had to remove one of these to get to the bolt heads. By chance I got the correct side first, but it was a few hours of sweating and swearing before it was finally off and the hinge released.

Once it was off, I took it to Seaweld in the yard and they did a proper job on it in a few hours – thanks Sandy! 

Refitting was the reverse of removal (as per Haynes Manual), but still took many hours.

Once back on the rudder was a bit stiff, but at least it was back on and we were back on track…

Rewire

Not much to say about this, but as the last bit of work on the boat, I’m going to tell you about it anyway! I rewired the whole boat with proper marine grade wire, and added the generally accepted minimum requirement of fuses for all electrical items!

The original wiring seemed to have been added piecemeal, and without much regard to the consequences of short circuits and the like.

I added proper distribution bus bars, shore power, new switch panels and circuit breakers where required, and replaced all the old domestic grade wire with proper tinned wire to resist the progression of corrosion evident in the existing stuff.

It took a week, but was worth it – everything is 100% protected from short circuits and looks and feels a lot more reliable than the rats nest of wires originally in place.

 

Bow Thruster install – almost done with boat yard action now…

Being long keeled, Mary Alice is a pain to maneuver. And as such, the worst part of any trip is the getting into and out of a marina, or tight river full of moorings.

She has a turning circle like a super tanker, and when being washed down-tide while trying to turn around, nerves start to jangle somewhat.

To counter this I settled on a bow thruster. Then I found out how much they are to get professionally installed.

Once I had done some reading however, it all seemed pretty straightforward, so I set about doing some research into which one I needed, and whether it would fit in the boat sensibly.

In the end I settled for a Lewmar TT180 5Kw and its position would be in the bow locker right forward under the V berth, where the tunnel could be quite short and the depth of the hull was great enough to place it very low down. I could also site the battery in one of the smaller lockers there too.

Once I had all the bits in the yard, it took me some time to garner the required courage to drill holes in the hull and cut out the massive 180mm diameter hole required for the tunnel.

However once I got going, it was all pretty easy – if disgustingly smelly, dusty and awkward work.

First I cut out the hole (marked as indicated in the Lewmar instructions with a pilot hole and piece of bent wire) with a jigsaw (4x blades required!) then ground the edges down with a mortar chaser tool in an angle grinder to make the hole the right size.

Then once the tunnel was in place I glassed it in place with a load of filler, with added chopped strands to give it some strength and added fillets to the inside surfaces. The outside got the same treatment, but also some patches of glass cloth.

Once the filler was tacky, I set about with strips of glass cloth, then CSM, then more glass cloth and CSM, then a final layer of cloth to build up the join between hull and tunnel. The laminating was in many ways the easy part, keying up the tunnel and hull was done prior to the glassing with an angle grinder and flap sander disc and was very awkward to avoid covering everything in dust and still getting enough material off.

The laminating under the tunnel was awkward, as I had to hang upside down in the locker using a mirror to do the pieces under the tunnel. It all went in eventually however and looks plenty strong enough.

The outside was then trimmed, faired and painted with topcoat. More topcoat was also applied to the inside once completed.

All that remained then was to fit the gearbox (pretty easy following the excellent Lewmar instructions) and bolt up the motor saddle and motor.

The whole operation from marking out to having a fitted motor was 2 long days.

That was only about half the work through, as the electrics is a big part of any bow thruster install – this one draws 500 amps at startup so required some monster cables and a battery up forward, with a battery to battery charger between the domestic bank and the bow thruster battery.

The more difficult bit was making terminals in the 95mm2 cross section cable, but with a hydraulic crimper bought from Amazon, this went ok.

The battery charging cables ran along next to the existing windlass cables, so pulling these was easy.

Again, probably about 2 days work in all, then some minor tweaking bits, like making a remote control for the cockpit (there is no good place to site the control panel) and it was all done.

It works a treat, the powerful 5kw version was the one to go for, the boat pivots nicely when required, and the thruster can be used along with usual rudder and power to spin the boat tightly in a small space or round a tight marina corner.

 

 

Antifouling with Copper Coat

As a long keel boat – Mary Alice has a lot of underwater surface. Instead of having to antifoul it every year (I want a low maintenance boat..) I opted for some Copper Coat – as this should in theory last for 10 + years and only require a jetwash every year, not a full rub down and repaint with antifoul. It’s not cheap, but then getting someone else to do the antifoul every year isn’t either (which I’d have to do if the boat is left in another country or far away from home etc). I paid £40 per meter for this last year, so a bit over £400 for antifouling from Mylor – which will be inflated, given Mylor’s greediness, but there or thereabouts.

The copper coat arrived in super quick time (it’s only available direct from the suppliers), and weighs a lot! I was advised to get 14 kilos of the resin + the copper additive to go in it.

Before we could coat the hull, we had to remove the original antifoul and take the boat back to the gel coat. I did this with an angle grinder and a 40 grit sanding disc on a rubber pad.

 

It was  horrible work.

 

I never want to do that job again.

 

Toxic dust everywhere, in my ears, hair, nose, etc even though I was wearing a tyvek suit with hood, goggles, ear defenders etc.

Luckily the weather was good and a combination of me and my dad had the old stuff off in about a day.

Painting on the copper coat is relatively straightforward.

Mix the resin and hardener together, add the thinner, add the copper. Paint away in thin coats.

The first coat looks awful, then repeated coats (once the surface is almost dry, otherwise you pull the original stuff off with the roller).
We did about 6 coats per side of the boat. It took all day.

The end result is pretty good though, slightly shiny and it looks very smooth and water-friendly.

Should last for a good long time and be very easy to maintain.

Installing running water!

Installing the water system.

Mary Alice originally had a single hand operated water pump and no water heater etc, other than the kettle. This is fine for a few weekends, and lightweight summer sailing but for an extended trip i decided to fit a proper calorifier and pump system. 

The calorifier is square – not the usual round ones, as I couldn’t find a space big enough for the classic type. It’s a 15 litre one, which when the heated water is mixed with some cold to get about a 40 degree output produces a lot of hot water for two people.

Its powered by a jabsco water pressure pump with a small (2 litre) accumulator tank. There is also a shower head in the cockpit, so hair washing and general showering can take place in quiet anchorages – or maybe under the cockpit tent that has not been created yet…

The installation was really straightforward once I had made some plywood plates to accept the calorifier and the pump etc.

I used some cheap stainless hoseclips from screwfix – big mistake, I ended up changing all 15 of them eventually to stop leaks once it was all pressurised.

The main galley tap was from amazon – the cheapest of the brass mixer types, and worth every penny – its amazing quality for the price.

I also fitted a jabsco diaphragm shower drain pump to empty the sink as the original hand pump didn’t like hot water, or any food particles. The shower pump is amazing, pumping away basically everything we throw at it down the sink – rice, pasta bits, a slice of leek…

There is not much to say about the installation, but here are a few pros and cons to the stuff I bought to install it.

  • Square calorifier, very good, easy to fit, but no hose spigots included, these are expensive!
  • Jabsco pumps (pressure and drain) are brilliant products, adjustable outputs on the drain pump, quick release hose connectors and vibration isolated feet as standard. Very happy with these
  • Screwfix hose clips – avoid like football fans on a train.
  • Vetus water hose (connection from the engine cooling system to the calorifier) – ridiculously expensive and doesn’t come in standard hose barb sizes – there must be a better option than this Vetus rubbish, but it appears to be all that marine surveyors want to see this in place of other brands.

Fitting a diesel air heater.

I bought a diesel heater from Russia. The Webasto and Erbespacher ones are hideously expensive and frankly get mixed reviews – although I think most of this is due to their installation.

It arrived well packaged from an ebay store based in Ekatarina with lots of cyrillic on the tape that meant that I got charged 70GBP in customs fees, which I was expecting.

The kit included a marine exhaust outlet, which was left out of the main box by accident, but a quick email to the Russians had it delivered promptly.

It is a 4Kw version made by Planar – basically identical to the Werbasto version as far as I can tell from some internet searching.

In order to install it, I needed to locate the heater in the aft dead space behind the transom (to keep the exhaust run as short as possible, and also keep the noise down) and then run ducting throughout the starboard side of the boat – my intention was to have outlets in the saloon (2), the heads, and the forward cabin.

I bought the ducting from another ebay store, it was pretty hard to find what I needed, but 10 metres of ducting and some vents arrived in a giant box. The T pieces I got from screwfix as they were £15 (!) pounds cheaper each at a whopping £2.50 than the ‘official’ marine ones, and they are basically just a plastic t piece.

To begin the install I tried reading the manual, but as its 100% in Russian I gave up and figured it out from the pictures.

To mount the heater I got a sheet of stainless from the welders at the bottom of the yard for a tenner and drilled some holes in it, hammered it into shape and fixed it to the heater the bulkhead – observing the clearances required around the heater itself.

Then I began to run the ducting and wrap it in insulation – it took me 3 days. I had to cut holes in 13 bulkheads, usually in the back of lockers, or next to expensive bits of equipment…

In the end though it was done and the ducting in place. I won’t bore you with the details, It involved using a giant hole saw, and many drill battery recharges –  I don’t ever want to do that job again.

Once all the ducting was connected, I hooked up the fuel line to the tank and temporarily plumbed in some electrics. It took a few false starts, but eventually the thing fired up and the air coming in to the cabin was toasty hot. Its pretty noisy on full whack, but I can forgive it this for the heat it generates.

The control unit is pretty basic, so takes some getting used to, but the unit itself seems pretty robust and the installation should be good for drying clothing (main reason for an outlet in the heads) and general comfort. Worth all the difficulty in installing it I hope!

Making a chart table

Mary Alice’s chart table is simply a piece of flat plywood with some fiddles. This works fine for chartwork, but any charts that are not in use have to be stored on the shelves, settees, on the floor etc, essentially, they get everywhere and they get dog eared and damp. I decided the boat needed a proper chart table a while ago, but have only just got around to making it.

I got all the wood from KJ Howells, (along with the deck stuff at the same time). They had a seconds bin with a couple of nice radiuses in it that would do for the corner, and the rest of the structure is some rectangular teak profile and some 12mm Gaboon faced marine ply – which is much cheaper than teak faced ply and still looks pretty nice when varnished. The sheet of ply i selected with the guy from KJ Howells is amazing, completely perfect, knot free and looks like teak anyway. It is also very dense, and shifting a 8′ x 4′ sheet out of the van wasn’t easy.

I started by cutting the old chart table down slightly to make a template for the router, then i rough cut the plywood into almost the right size piece (less than a router cutter width outside the finished size) with a combination fo jigsaw and ripping hand saw. Then used the router with its template following guide to cut through the last section following the template made from the old table. This ensured that the top and bottom sheets were identical.

I did also reduce the depth of the table by 100mm as with the original one you needed doubkle jointed knees to get into the quarter berth…

I then profiled the teak edge with a router table to accept the 12mm plywood. This was then glued into position along with the remachined corner radii. The whole lot was then sanded and whittled down to the right size and shapes (flot top for the base, and rouded over for the fiddle).

I then cut the opening section out of the top layer as close to perfectly 90 degrees as humanly possible with a tenon saw (nerve wracking!) and then glued the whole base lot together (with about a million clamps).

I also then found some cheap piano hinge at Toolstation (which you have to buy 10 metres of for £16!) and glued on some strips to accept the brass screws on the opening section and the table itself.

Once it was all screwed together I spent an hour or two sanding the whole thing down. I took it down to the boat last week and it all fits (well, it needs a few mm removing from the back edge to make it fit, but this was designed for so should be pretty easy to plane off when required).

Its currently being varnished with some yacht varnish i found going cheap in the shop where i bought some fibreglass recently. I reckon it’ll need about 4-5 coats.

Its not actually taken that long to make, but has saved a pretty penny on professional joiners fees had i actually foound someone to make it (I’m sure Mylor would have chared at least £1000 for this alone). I also have the control to make it ‘as good as it needs to be’ as it doesn’t need to be Nautor Swan quality, but also not just a B&Q fence panel either.For example you can stil see the plywood edge when it is open, but this is acceptable to me as the finish is similar to the rest of the yachts interior.

   

Making the replacement cockpit seats and locker tops out of teak.

Mary Alice leaks slightly. The starboard side of the cockpit doesn’t have lockers, it only has a seat above the quarter berth on that side. The rainwater has got into the teak panel and the teak has cracked, the caulk gone and rainwater seeps into the quarterberth from above through the panel. So i decided to replace it, and while there, make some matching locker tops for the port side, as the caulking was also bad (it was not actually caulk, but epoxy resin with carbon black in it, not good as it doesn’t flex with the wood like proper caulk does).

The job should be easy, but like all things marine, it costs a fortune and teak is currently not cheap if you buy genuine, legally harvested stuff. I got the teak and marine ply for this project from KJ Howells timber in Poole. The guy in there was incredibly helpful and provided everything i needed for these panels and also the chart table (but thats for another post…).

I was originally going to get them made professionally for speed reasons, but costs are starting to become an issue, and in the end they have been very satisfying to make.

I started by cutting pieces of 9mm marine ply to size (from a template of the starboard side seat, as it is still attached to the boat, and the actual lcoker tops from the port side as they unscrew pretty easily.

Instead of making the edges from solid teak (which is very expensive) I let the edge planks overhang the plywood a little and then glued on a strip of teak to hide the edge of the plywood. Its not 100% professional, but it helps avoid having to buy lots of lovely (did i already mention very expensive!?) teak, then machine it away to sawdust in order to make the edges neat.

I did the border planks first, then tacked them into place with what is essentially super glue, then filled in the gaps with more planks.

The correct tools for the job make this a lot easier – in this case a sharp pencil, long ruler and a mitre saw that keeps the very sharp blade at 90 degrees to the horizontal and has an adjustable angle against a solid fence, with this you only need to worry about the mitre angle, and not the vertical nature of the joint as it is 100% vertical everytime, if you see what i mean.

Once the planks were sized and located correctly, they were removed, epoxied into place and the rebates filled with sikaflex and finally sanded smooth.