Autumn Sailing

Short video of sailing this last weekend…

Some great weather, some awful. We had a great day on Friday, beautiful sailing weather and even managed to be there when the salvors pulled a large yacht off a beach in the Helford apparently after it broke free of a laid mooring. I hope it was ok, it was very lucky to mainly miss the rocks and end up on the beach.

Saturday was not so good… started raining almost as soon as we left the Helford and we got hit by a pretty powerful squall – boat laid over, sails flogging, unable to lower the gaff… it all went fairly wrong fairly quickly. Managed to sort it out in the end, and we slunk back to Mylor and managed to dry the sails out on Sunday morning before taking them off ready for Mary Alice to be laid up. Not before we ran aground off the fuel quay though… making a habit of this now…

 

 

 

Autumn Sailing from p k on Vimeo.

 

Here you are – standing on Tresco…

Here’s a little taster before I put a full report up of the Scilly Isles trip.

Here you are, standing on the very eastern-most tip of Tresco. St Marys is in the distance across St Marys Roads. Click it, drag it and take a look around! Full screen can be activated by clicking the little square in the bottom right.

Enjoy!

 

 

Finally – sailing.

Went down to the boat last month. She’s been in the shed for 11 weeks. Originally the yard quoted 3 weeks for the work – like everything they do, their estimates on time were woefully inaccurate – also represented in the way they quote for the work unfortunately.

However, I absolutely cannot fault the quality of the workmanship. The deck looks lovely, faired to within an inch of its life, antislip looks great and is rough without being knee worryingly so. The spars that were varnished (bowsprit) and repaired (gaff) and repaired and varnished (mast at the shroud cheeks) are gleaming under 7 coats of varnish.

The new bilge pumps have been installed on stainless brackets so it is humanly possible to extract them without needing double jointed elbows and the anchor windlass looks, well, like a windlass should.

 

We spent a few days re-rigging the boat. The riggers dropped the mast in and half heartedly tightened the standing rigging – admitting that ‘they didn’t have much experience’ of gaff rigs – not quite what they said when they whipped the mast out last year. I had to re-tension the rig and re-fit the topping lifts, pin rails and other stuff that they removed last year. They also twisted up the bobstay tensioner, and didn’t seize any shackles. At all. Not even one. They also didn’t reconnect the masthead lights or VHF wiring. Also, considering they took the mast out, they also didn’t replace the wedge that they say was missing – come on – a wooden wedge. It would be possible to knock one up in 5 minutes and do a ‘proper job’. That though, is apparently my problem.

Basically – the riggers put the stick in the boat. That’s about it. £259 for putting a mast in a boat is a lot. Fairly sure that I’m not the only person who will think this isn’t great value.

 

Still, frustrations aside, the weather was good for the first few days and the boat started to look more like she should. I bent on the mainsail, and did a trial hoist – turned out the gaff hadn’t been put back together correctly. Where the remedial work to the wood by the jaws had been done (and the saddle taken off) the eyes for the mainsail at the throat and the eye for the throat halyard had been put back in the wrong positions and the gaff then jammed on the way up and down due to the throat halyard forcing the gaff into the mast. Once the eye had been repositioned (to where it was originally, before the work) it ran smoothly – aided by a coat of dubbin* on the leather as it was very dry.

Also on the receiving end of the dubbin was the bowsprit traveller – this also had the outhaul replaced and I serviced the furler – which seemed to contain a mixture of grease, leaf mould and salt crystals when i opened up the thrust bearing. A brief interlude with a can of WD40 and a roll of kitchen towel int eh marina car park later, the bearings were clean and i repacked it with grease and it is like a new part now. I still need to do the same to the head swivel, which i suspect is in a similar state…

 

*dubbin – technically I’m sure i should have used some sheep based product – lanolin or something, but at 17 quid a tub that seemed a bit steep for some sheep extract.

 

We went for a sail once the boat was ready – and it was perfect. Force 4-5, put a reef in the main (more on this later) and experimented with the staysail and jib combos. We had the small jib up, the boat was ok, but not perfectly balanced, then the staysail as well, and she settled down, but was overpowered in the gusts, and tended to fight the helm. I think the main, being so long and low, will need reefing fairly early to maintain some kind of balance.

Once we were back at the pontoon i raked the mast forward a bit to try to help the weather helm and also reconfigured the topping lifts as they are a bit short. They are still a bit short even after the fiddling and i intend to replace the ropes and lengthen them a bit. They are also attached to the lazyjacks and this might explain why they are so heavy, as i think the lazy jacks are taking a lot of the load of the boom, from halfway along its length, giving very little leverage to lift it up effectively.

 

Work below decks included locker cleaning and deck head wiping by my wife (horrible job, but amazing difference) a mixture of minor mould growth and paraffin smoke stains came away by the cloth load.

I fitted a split charger (a Mastervolt 10a unit) that, once connected to the mobile mains kit charges the house and engine batteries when plugged in. This way we have a kind of hacky shore power and can run all the 12v stuff without worrying about the battery life. Not ideal, but cheap (about £150 all in) instead of a proper shore power setup that might go in next year.

Also attached to the rats next of wires (must do a proper bus bar job soon) was a solar regulator – this will stop the batteries being overcharged by the small solar panel we have (for battery maintenance really, not heavy use). The PV panel kicks out 17v at peak output and the regulator steadies this at 14volts for the batteries, it also controls the charge cycle. It is not super critical with the small panel we have – i suspect it never makes it to 17v –  but better safe than sorry for the sake of £20.

 

Other general tasks on deck included fitting some fender attachment points – as Mary Alice doesn’t have safety lines, we are a bit limited on where to tie fenders. I bought 8 bronze eyes from Classic Marine, complete with bronze screws. The bronze screws were a mistake. They have the structural integrity of overcooked spaghetti. Once I’d sheared one off, I learned my lesson and the rest went in ok, but it started raining while kneeling in the scuppers and i called it a day having fitted 5. Some more grovelling in the scuppers still to do.

The last of the jobs done was a bit of miscellaneous Sikaflex sealing of some leaks above the pilot berth (cracked caulking i think) and round the main hatch/ light above the saloon. Nothing serious, just annoying. Most of the boat is 100% waterproof though, which is somewhat unusual i think for a home built one!