Work on the boat has been shuddering on, doing little bits here and there, and surprisingly stuff is starting to come together. The next few posts are whats been going on, I’ve split them up to make it a bit more readable…
I finally finished the bow area, all locker lids are also done and fully painted, but stored away from the boat. I’ve epoxy coated but not painted the interior, i may regret this later, but as i stomp all over the boat and work in a shed with an earth floor, the boat gets pretty dirty at times and i don’t want to have to repaint everything again. The only painted areas are inside the lockers, which I painted before the locker tops went on.
The deck beams are on – this work went super easily. The kit is great in this respect. They fit, are fair and are completely accurate.
I also drilled the keel bolt holes using the top keel plate as a jig. I then bonded in some thick wall glassfibre tubing as per suggestions from Mr Martell.
Lining the bolt holes up was pretty straightforward using the keel plate, I then also used it to ensure the glass tubes were 100% aligned by dropping some M12 bolts (smeared with mould release) into the plate, then offering it up from below into the oversize holes, then bonding the tubes in place with them slipped over the bolts.
Finally i glassed the bilge area for abrasion resistance where the sole boards will eventually rub.

