Its been a few weeks since the last update and while it feels like i’m not done a huge amount on the boat itself, i’ve made progress on other ‘stuff’ that needed doing.

I reckon on average i do about 10-12 hours a week on the boat now. A few evenings a week after the kids are in bed and the occassional 5 hour block on a weekend day. Its hard to find a balance of boat vs family time, but now i’m on the home straight it seems easier. Also with working from home comes great opportunities to do the odd bit in the garage between tedious conf calls or the other corporate bullshit that i have to put up with daily. Putting a coat of paint on a locker door or chopping up fibreglass ready for a laminating session in the evening is a nice change from beating my head against a computer screen in sheer frustration at the stupidity of a large corporate entity.

So in summary:

Made a companionway hatch that was going to slide into a garage on the top of the pod – Scrapped the idea shortly afterwards. To create it I made a mould, laminated the glass, stiffened it with ply, and more glass, and added hatch dogs, but i didn’t like it and it was getting too complicated and fussy. Am going to go with a commercial hatch instead – this is also a time saving measure as i need to get the boat into the water to sort out the kinks before some longer trips in the summer.

Made the tiller – this is laminated oak from offcuts of the keel floors. I put a bit of bend in it just for fun.

Laminated the bowsprit too, but this still needs shaping.

Broke out the pipe bender and started making the pulpit.

Collected the trailer – made a few removable steel security posts that are concreted into the drveway to stop it getting nicked.

Completed the cockpit – including the internal mainsheet track support, extra blocking for dagger board attachments, doublers for boarding ladder, thru hulls and locker hatch surrounds. The cutouts for the cable gland plate and inspection hatches were also cut at this point. Doublers for cleats and rails are under the seat tops. Still to be added are doublers for the cockpit bilge pump mounting, but this is easily accessible. I added a layer of 200gsm glass to the entire cocpit locker area up to the top chine for impact resistance as it’ll no doubt see some stuff like folding anchors and other sharp items. The panels are all screwed and glued down and filleted ready for glassing. The only thing missing are the wedge shaped bits that sit under the mainsheet track that i want to glass over as well. These will probably be another oak offcut as its already about the right size!

Completed the deck – hatch surrounds are filleted, the mast base laminated up and stuck down. (I made a 3D printed mould for the mast base, and laid up a huge stack of glass into it, shaped the base of it to the deck profile and bonded it on and filleted it). The pod went together well, with extra glass on the inside and doug fir stiffeners and framing as this will be an exposed thing that will take a knock if something bad happens. The side and front panels are pretty much double thickness ply given my window design. I still need to add some deck beams that run fore/aft under the edges as ‘trimmer’ beams, but it seems plenty strong enough already.

The keel has been ground down (4+ hours of angle grinding with a 9″ grinder and 8 discs to create a LOT of iron filings…) It was then welded by a fabrication comapny here, but needs a bit of straightening where the heat distortion on the 8mm plate has made it a less than perfect fit… Once straight it’ll be sanded/shot blast and epoxy coated (probably sanded by me, as it no longer fits in my car for easy transport to a shot blaster!).

Made a sample constrictor jammer – This was simply a copy of the super-light Ronstan jammers commonly seen on mini transats. It’s a piece of Aramid outer sheath, held in an aluminium ferrule over a stainless steel thimble thing. I 3D printed a mount to test it out and it only bloody works with 8mm and even down to 6.5mm rope (which was a massive surprise!) – so now i need to make a resin/glass mount for the ferrules and we’re in business with some cheap jammers. I’m going to make 2 blocks of 4 so i have a couple spare.

Other stuff (with no pics) are the rudder is laminated and shaped roughly and the dagger boards are also at the same stage (courtesy of my Dad who is a pretty handy woodworker) and the skeg is basically finished, having been filled and faired (just needs a minor tweak to complete it fully).

All in all some good progress all round. Still (just) on track to have it mostly completed by early June… but I’m not super confident of this timeline!