Avoiding the burn

The boat has a full complement of British built ah, comfort, devices – a Blakes Lavac loo, a Taylors paraffin stove, and a Taylors paraffin heater. Having tried them all I can confirm that, at least in the marina, they all work admirably.

 

When we bought the boat I was told a story by the previous owner/ builder.

He had sailed to the Scilly isles, had a good week pottering around with family and was going to sail back to Falmouth single handed. Something about one way being enough for some crew members.

While leaving the anchorage he had the heater on. While he was down below, the boat lurched off a wave and he grabbed the nearest handhold. Once the synapses in his arm jumped into life he realised that he had just grabbed the flue from the heater (it has no guard) and was busy branding his palm.

Immediately resting his hand in a bucket of cold water for the entirety of the journey back (I have no idea how he must have managed sail changes), a single layer of skin completely peeled off his palm in one go some miles off Falmouth and brand new layer of not-too-tender skin was left for him to complete the voyage with.

 

Aiming to avoid this scenario I have designed a heat shield for the heater flue. It needs to let some heat out, but protect stuff from the flue itself. I looked at the Taylors ones available, and while nice, they are hideously expensive and rather short for what we need.

I’ve drawn it up in CAD and it is being laser cut from some 1mm stainless sheet. Not having a press I have used a lazy bend system to make it fold correctly. Certainly not as neat as a proper form, but a lot easier.

The brackets to hold it have tabs to hold it against the flue correctly and stiffening flanges and rivet holes to attach to the guard itself.

 

When rummaging in the cockpit lockers i came across a flattened flue cowl. Completely squished out of all recognition. To avoid this happening again (and mainly to try to avoid burning holes in the sail – which could get expensive) I’ve also designed a guard for the exterior portion of the flue. This is made from 5mm mild steel and I’ll weld it together when i get a chance. Once galvanised it should be man enough for some salt water treatment. Again, the parts are being laser cut by the same blokes in Rotherham, its only tiny, but the laser cutting gives a super neat finish and less time changing blades on the jigsaw.

I’m not too sure about the design of this guard – it looks quite utilitarian (and a lot like a birdcage) but needs to be rope-friendly for hte jib sheets to slide off and also quite robust to take a knocking. I’ll see what it looks like when its in place and make a call then.

Rot Rot Rot

A pretty wallet bruising weekend in the south west. I took a couple of days off from MegaCorp™ and traveled down to the yard. Its a bit of a hike from my dads place down to the boat so i booked us into the Falmouth Hotel. Its a massive pile on the narrowest part of the peninsular. Lovely view, but i got the impression we were about 40 years too young to be there. Maybe when the faculties start deteriorating you stop noticing the ill fitting carpet (gripper rod showing), broken lamp shade, trim falling off all over the bathroom, and the concept of a twin room being two single beds pushed together with two duvets!? The service was excellent however. Still, it worked for a night and we got a lot done…

 

Mary Alice is deckless. Its taken a long time due to the construction – 24mm of ply, 2 layers of 12mm. A thick plastering of CSM and polyester resin all over it all. Lots of trimming away slowly and peeling the sheets of ply off.

 

Having pontificated previously about the need to use epoxy and woven cloth, it won’t now be necessary. The deck is so massive (it could be half the thickness probably) that the strength comes from the ply – the GRP is just waterproofing. For this we can use regular chopped strand mat and the much much cheaper polyester resin. The bond between the ply and glass can be improved by some solid surface prep on the ply.

So, if it wasn’t the cracking polyester, why did the deck leak? The yard reckons it’s simply a case of poorly sealed fittings – all the damage is around areas of high load or poorly fitted items. The area under the bitts, around the portholes and the cockpit area are all rotting – purely due to the water finding its way in between the fittings and the GRP.

 

The guys had started to pull away the damp bits of the ply around the cockpit coaming – the damp has crept in where the GRP meets the Iroko trim. Sure enough we now have to replace all the ply around the cockpit coaming…

 

<sound of cash leaving wallet>

 

It was also pointed out that the winches are held on with a few 8mm bolts and some penny washers… The yard will be adding a rounded ply block under each one and bolting the winches through the new block down to the deck beams. The whole block arrangement will be glassed over to seal it and ‘hide’ it as best possible.

 

<sound of more cash leaving wallet>

 

In other news – I took the Taylors stove out of the boat and spent a very sunny day cleaning it up and polishing it… sure it won’t stay like this for long, but sure looks nice in the interim! It appears to have had almost no hard use and came up well with some cif and a sponge, followed by some metal polish and fine wire wool.

Its been very nice to be actually able to put some sweat into the boat (even if it is just polishing!). I could probably do all the work being done on her, but simply don’t have the time or the job to be able to do it.

 

I also took advantage of the (almost unbelievably) good weather and laid out all the jibs and staysails.

There are two staysails – a working one of very heavy canvas, a light weight (but smaller) high footed one and also a storm jib of minute proportions.

There are three jibs, all with a wire luff and wrapped up, I didn’t unroll them, but they seem to form a nice range of sizes. I’ll have to wait until the mast is back in to truly investigate each one.

More deck stuff

Got some more photos from the boat builders – they’ve discovered that the cockpit coaming is rotting too… yet more damp plywood to replace. This boat is looking pretty sorry for herself right now, but given some more attention she should be back in the water by the spring.

In other news, I ordered a Blakes under deck pump for the heads refit – not much to do in there but make the pipework neater – including a recessed pump location and tucking the pipework behind a locker. Probably live to regret this choice when a takeaway curry gets the better of the plumbing.

Latest deck photos

Managing to keep track of whats happening to the boat while traveling and working gets pretty interesting – so i asked the guys doing the work to keep sending photos as they do the work. I’ve dropped some of the photos into a gallery – here is the progress so far!

The deck is being stripped off one layer at a time, first the GRP, then the two ply layers. I was going to get the coachroof done as it has some small patches of damp, but the majority of the woodwork is still sound, so on advice from the boat builders we are leaving most of it intact. Which is a decision my wallet loves.

MegaCorp™ keeps me pretty busy and doing the boat – even vicariously – keeps me sane. If its all going to shit at work at least i can stop and think about what the the next 18 months or so will be like.

I’m in London this week, the site is next to a tiny riverlet that goes out into the Thames, walking along the heavily polluted river this lunchtime was almost like summer when the sun came out from behind Canary Wharf.The ducks can pretty much walk on the river its so full of crap. Plastic bags, bottles and other rubbish flow in and out on the tide. Pretty grim, but at least its an open space with some skyline.

New deck

Mary Alice has a minor deck problem. The survey showed some fairly large areas where the GRP sheath had been cracked, water had got in, and the plywood started to go soft. Ordinarily I think a local repair would have sufficed, however the plywood used was not marine ply and consequently I think doing a number of minor repairs would be false economy in the long run given the difficulty of making sure all rot was removed.
Instead she is getting a whole new deck and coach roof.
The plus side is that she has a fairly simple deck and coach roof shape. The downside is that taking off all the existing materials will take a long time which equals lots of labour.
The current GRP sheath is polyester resin and chopped strand mat. These two items are not really suitable for sheathing plywood. The polyester has a low adherence to plywood, and the CSM has a low strength and poor surface finish, therefor the strength of the deck comes from the plywood under a poorly bonded layer of GRP and added to this, polyester is brittle, so given this perfect storm of conditions it isn’t surprising that the GRP cracked at points of land (the bitts for example) and let in the elements.
To renew the deck I’ve asked for two layers of ply screwed and glued to the deck beams, with joints staggered and not on the deck beams. Then sheathed in tri axial cloth all stuck together (including between the two ply layers) with epoxy resin.
The epoxy has a much higher peel strength than the polyester and the triaxial cloth will provide some strength along the directions of the fibres, rather than just depth and marginal strength that the CSM does.
The other advantage is that the finish on a cloth is so much better than with CSM. If a peel ply is used to cover the finished laminate a much reduced finishing time is required.
The final finish will most likely be paint, but we’ve toyed with the idea of fake teak, real teak and everything in between. A final decision hasn’t been made yet though!