Metal bashing

The chimney flue protector stainless arrived from the laser cutters and I got around to folding it up and riveting it together…

Its always a bit un-nerving getting stuff back like this, when the last time you saw it was a series of lines and curves on a computer screen as opposed to a physical thing. The chances of having made a monumental cock up on the dimensions or even just designing a part that is physically impossible to make (been there a couple of times…) are quite possible.

This however, went together perfectly. The lazy bend ‘stitching’ looks a bit shonky, but the other option of getting someone to form it was hideously expensive. Hopefully the eye will be drawn by the little Mary Alice on the front…

I bent the stainless along the lazy bends between two pieces of wood clamped up tight. It was hard work keeping a secondary bend out of the flat surfaces and I didn’t quite achieve a perfect finish (the front face has a very slight curve to it), but it is ok for me considering I don’t have a press or a metal folder. I think working literally in the middle of an industrial sheet metal shop for 2 years as an industrial engineer has made me a bit picky about things like this.

The brackets that hold the whole thing together riveted up nicely and the forms were the perfect offset to pull in the sides perfectly square. All in all, not bad for £55 of laser cutting with material included as well.

 

Print me tidy

So inevitably I ended up nerding out with more things to make for the boat while at home in between being in the Czech Republic and the UK during the week.

Travel like this pretty much screws up any chance of having a routine – being at home at the weekend becomes a real luxury – not having to think about where I am supposed to be or what project I need to work on that day. Just simply being at home with a cup of tea and the 3D printer humming away is a good antidote to the rush-wait-rush of air travel around Europe.

I drew some rope tidies like these ones and printed a few out ready to attach inside the cockpit lockers. Mine attach with two screws, not just one (as per the Barton ones) to stop them spinning around – and it just so happened that I had some glow in the dark filament in the 3D printer, so mine will be visible in a dark locker… or not actually – as they need light to activate the chemical reaction in order to make them glow in the first place. Never mind – they will tidy the ropes nicely though once I get around to fitting them…

As the part i drew had big overhangs for the ‘hook’ bit and the area where the rope will sit before exiting out of the bottom I had to print the part with ‘support’ material as well in order that the filament was capable of managing the overhangs. It is a light 3D mesh of filament that bridges the voids caused by the gaps under the part. Whoever designed the program that figures out the density and placement of the support is a true genius – it snaps off cleanly and tidies up simply with a craft knife and light sand down.

I love the 3D printer for stuff like this. You can design a part on the computer and an hour later be able to evaluate whether what you have designed is actually going to work/ fit your requirement/ be ergonomic etc etc. I plan to experiment more with this on the other boat stuff as 3D printed patterns can be used to sand cast bronze for fittings etc…

 

Some drawing.

So the Autosteer is legless. The yard somehow managed to crack two castings that were rather shoddy anyway so i needed to get some more to fasten its legs back to the transom. However, Autosteer units are no longer made. Originally they were made by a small company in Cornwall, but they now seem to have fallen off the web entirely – so therefor must have ceased to exist. Ever.

I took one of the half decent castings back home with me and drew a few technical drawings of the brackets and pin thing and sent them to about 10 machinists I found online. 5 replied, and only one was reasonably priced. Lomach, near Fowey could make the parts in two weeks and also offered to post them to me. The prices were very good – mainly due to the fact that Lee (Lee Osbourne Machining – geddit?) CNCs everything that he can – so essentially leaves the machine to run itself once he’s programmed it.

If I’d known this I wouldn’t have done the technical drawing and would have provided the solid model – but hey, I know for next time…

ah..

Got an email from the yard. Turns out the self steering bracket fell off.

I mean the whole assembly.

It’s an AutoSteer unit from a company in Cornwall. Most of it looks ok, but the quality of the aluminium castings is horrible.

I used to work for a company that produced (amongst lots of other things) aluminium explosion-proof call points for oil rigs. We got a batch of castings from the foundry that looked like they were made of Wheetabix. Somehow the paint shop managed to make the powder coat stick for about 30 seconds while we inspected them. I learned a lot from the cheif industrial engineer at the time.

The horrible texture of the castings were what happened with a ‘cold shut’ he explained. The molten aluminium is let into the die when it is not yet warm enough and as a result it cools irregularly. You end up with flakey, pourus castings with the structural integrity of feta cheese. The second problem is that when the casting goes into the powder coating plant, and once coated in powder goes into the oven, the pores in the casting de-gas and make tiny pinholes in the coating, leading to a powder coat that lasts about a week in hard conditions.

It is possible to make a better powder coat by running the casting through the oven first, before coating, but it still ends up being rubbish eventually.

The castings on the Autosteer unit are obviously fairly poor quality (probably as a result of the process above)  and some have already been replaced. The powder coating is falling off some of the brackets, which makes me think the others that look ok are probably a bit rotten on the inside.

Basically i will need to replace them all. I’ll do a drawing next time i’m at the boat and get some machined up. More expense! – but at least the whole assembly didn’t fall into the harbour!

But basically Mylor Marine Team just made up a story about it falling off. Things don’t just fall off. They knocked it off and decided that they didn’t want to pay for a replacement. Which is a lot like their attitude to most of their work to be honest.

 

Spring Coat

Got an update from the chaps at the yard that the flowcoat had gone on – some kind of incident had left brush marks in the finish (unfairly this can be called ‘rush marks’) – probably trying to flatten a large batch of polyester to the deck in record time or something… Either way the guys there decided the finish wasn’t good enough so adding some extra and flattened it off, in fact their words were ‘we thought you’d not like a fishing boat finish’. I’ve seen some good looking fishing boats on the Fal though.

It’s now eleven weeks since the boat went into the shed. Which, considering the fact I was told it would take three weeks in total including the coachroof whih we didn’t do (ok so they found some more rotting stuff, but really maybe a couple of weeks extra work at the outside) is getting less surprising with each passing week. Not sure why it is so complicated to make an accurate estimate on the time taken to do a job. Luckily it’s not important that the boat is not in the water – We’ll be just in time for the commissioning sail in mid May!

 

 

Geeeaaarrrppeee.

The GRP is down. Ply finished, deck waterproof. The job looks great – the finish that i can tell from the photos looks nice, the margins where the old and new GRP joins look neat.

The grey finish is just the resin colour, not the final product. There is still flowcoat and grip to be added to this.

It’s fab to see the yacht with the deck back on. Makes her look a little less forlorn.

 

 

Random progress

Quick post as I’m having lunch…

The foredeck glassing has begun…

First layer trimmed to fit…

The calls from the yard about finding more and more rotting plywood have largely stopped now, the hatch cover was the last damp discovery. A new one has been laminated up and fitted to the original frame. Wildlife discovered living in the plywood has been repatriated…

Ply planking

Got a few updates from the yard – loads of progress on the boat! I’ve been traveling around a bit these last few weeks and haven’t had a chance to update the blog. MegaCorp™ seem happy with the last project I’ve done and have moved me onto a load more… More hotels and more planes and trains etc.

 

The cockpit coaming:

The new cockpit coaming has been laminated up and fitted along with a new carlin down the side of the cockpit. The guys at the yard decided to change the way the coaming mounts to the side of the coachroof and have created a stronger join – looks ok too.

 

The deck:

The foredeck ply went down, then I got an update a week and a half later that the rest was almost done. Both layers of the ply are screwed to each other and the deck beams. The underside of the foredeck section has had grooves routed into it to replicate a kind of planked effect. Two layers of 12mm ply should be adequate strength-wise…

 

The coachroof:

The ply around the two portholes where the surveyor found the rot have been uncovered and quantities of a kind of compost removed. Lovely.

New ply will be scarfed into place to repair the sections.

 

 

Chimney Protector Number 1

After about a week of emailing a bunch of drawings around the Yorkshire area (was up north in the UK for a bit) i found a company that would do the laser cutting of the chimney protector bits for a good price – its only a tiny amount of work, so the bigger places weren’t interested – if they bothered to reply at all to my jabbering emails…
The guys at GenFab in Rotherham have a great setup – they make a load of different stuff in their fab shop, explosion proof enclosures, wood burning stoves, rebar fabrications… and they have two laser cutters, one brand new, one a bit older. They cut the pieces of the exterior chimney protector out of some 5mm mild steel in a day or so and I picked them up last Tuesday.
Once cleaned up (they did a fast cut as requested and the parts had some start/stop marks and some burrs, but its nothing that a bit of swift filing and emery paper won’t fix) the parts slotted together perfectly and I tack welded them into position. Being an idiot I didn’t check that all was square from all angles before I final welded them (from most directions it looks ok, from one, it looks like the top ring is on the wonk a bit… duh). Having not welded for a bit, i did most welds twice before I finally decided that enough was enough. It looks ok I think. I shot blasted it to give it some texture and to clean off any left over welding marks.
(This alone took about an hour as getting the flipping shot blaster working was a mission in itself due to having left a load of aggregate in its tubes last time i used it and it set rock hard – i have left it empty this time…)
Once it is galvanised it should be adequate for the boat. Still not sure it’ll look ok though – its definitely a birdcage – but it is surprisingly small so might get lost in the general deck clutter.

Cockpit coaming

Got a call from the boat builders the other day – more rotting plywood was discovered in the cockpit coaming – once this extremely surprising news was digested exactly 2 milliseconds later, the decision was made to cut/scrape it all out and start again with new materials. The yard have replaced some timbers (carlins/carlings ?) that run around the cockpit itself, and formed up some new coaming sides from 6mm ply. They refitted the original top Iroko and will be adding the new winch pillars before the GRP goes on. Can’t fault the workmanship of these guys.

Its been a bit of an interesting journey so far with this boat – i’m amazed how little of this damage and rot was actually picked up by the surveyor – he managed to find the small deck sections and the bits in the coachroof with his tapping hammer thingy. I guess the GRP was so think that it doesn’t necessarily work as a technique on this kind of construction. There must be a better way to find rot than simply by tapping bits and listening to the sounds the part makes. Surely.

In other news I bought a new transducer for the depth/speed. Currently there is only depth via a NASA unit. Via a long winded postal chain its made its way to the yard and it’ll be fitted into the existing cavity before Mary Alice is put in the water. I’ll do the wiring later – its all part of my plan to modernise the instruments a bit…