Trying to fix weather helm…

Right, bear with me here – this gets a bit windy as posts go. MA has some significant weather helm. A little is desirable and a lot is just tiring. I’ve decided to get the main recut or replaced to try to help it. Here is how I came to that conclusion.

Firstly some stuff about boat design – I took it mainly from the various t’interwebs (one of the few forums that doesn’t degenerate into a personal slanging match between contributors) and this book. Which is amazing by the way, if a little involved at times for my tiny brain.

Weather helm is caused by the difference between lateral resistance (the hull ‘dragging’ through the water sideways) and the action of the sails trying to spin the hull through that water, Like a lever, if the centre of resistance (a stubborn nut, say) is a long way from a force (using a long spanner) the force required to spin it is reduced, and weather helm is worse as the same force exerts a high turning moment on the hull.

turning-moment

The same happens with the forces on the hull. The sails are the spanner (the centre of effort), and the position of the ‘centre of lateral resistance’ on the hull is the nut. The problem is that centre of taleral resistance moves. Confused? Me too.

FIrst we need the CLR (centre of lateral resistance) of the hull. Hydrodynamically, this is a major pain in the ass to find. So we use a simple version which is simply the geometric centre of the wetted hull area (the bit in the water). This works as most hulls are symmetrical-ish fore and aft, but just have a sticky down bit of keel too. (think double ender with a keel). And anyway, as we know that there is weather helm, but we want to reduce it, the most important thing is to have a fixed starting point to calculate the relative positions from and then work from there in a percentage to see what the effect of cutting the sail down will have.

With some fancy computer programs and simulations the actual CLR could be calculated, for any angle of heel etc, but essentially…

CLR as geometric centre of the wetted area of the hull will appear to be to far aft to make sense… However…

CLR moves forwards when the boat is moving (to do with pressures on the ‘leading edge’ of the hull, vs. the aft parts I think…).

CL-R-etc

It also moves forwards when heeled (for the same reason, think of the fat bows of the boat leaning over and pushing more water out of the way, rather than a vertical forward section of the boat when it is flat. Heeling is also usually associated with increased speed through the water – meaning yet more weather helm…)

heeled-over

 

There is yet another factor – that of the sails being not on the boats centreline etc, but for the time being I’m not going to try to get my head aroudn this one. So for now we just want to know where CLR is in relation to the Centre of effort (CE) so we draw it on a diagram – the CLR will be behind the CE of the sails

WHAT?!

The CLR will be behind the CE of the sails?! But that induces lee helm?

Yes – but given that the CLR moves forwards when the boat is moving, then the diagram starts to make more sense. The difference between the CLR and the CE of the sails is called the ‘Lead’. i.e. the amount the CE is in front of the CLR.

 

 

So back to Mary Alice. Firstly I drew a sketch of the hull lines (from a photo of the boat out of the water) in a CAD program (I use CAD for a living so this bit comes easy). The I drew the sails (moderate sailplan, i.e. staysail and middle jib), and divided them into section to calculate their areas.

Lines-plan-sketch

To calculate the sails combine centre of effort I did the following, as discussed in the ‘Principles of Yacht Design’ book above. 

Essentially, you calculate each sails geometric centre and its area. Then draw a straight between the geometric centres of each sail. The distance down the line as a proportion of each sails area is the combined CE for the two sails. To get the combined CE for all three sails, I did this twice, once for the forsails and once again to combine the forsails with the mainsail.

hull-view

 

 

I then had the lead of the CLR to the CE (accurately in CAD, to the nearest 0.0001 of a millimeter…

The lead is usually represented in percentage of waterline length. In the book, for a long keel yacht this should be between 10 and 19% – Mary Alice’s is 16.3%. We know she has weather helm already, so as previously in the post, just having a base point is all that is necessary, and frankly, my calculations have so many assumptions that this might all be horsecrackers anyway. Either way, I’ll get a comparison between the resized sails that i can use to see if it is worth it getting the mainsail recut.

I ‘cut’ 600mm off the back of the main sail and calculated it again…

comparison-of-CEs-to-sail-length

 

From this it showed that the lead moves forwards by about 300mm by cutting double that off the back of the sail. Essentially this is like moving the mast backwards by that same distance. Should be pretty effective along with taking some of the bag out of the sail at the same time. The lead has changed to 19% – the top end of the advised range in the Yacht design book, but within the range.

It also lowers the CE of the mainsail quite considerably (+600mm). This will lower the sail’s moment and make the boat a bit more handy in rough weather and higher winds.

overall-view

 

So, heres a picture of what the new mainsail will look like. The reef lines are shown as well. Currently even with three reefs the main is far too big. The new reefing points will mean the third reef is properly sized, so MA will have a decent chance of reasonable sailing in anything above a F6.

Smaller-Mainsail

2 hours on the tube thinking about reefing lines

Heathrow, 20:00 Wednesday.
A couple of days up country in Spain and back to the UK. Heathrow is a modern marvel, by the time I’ve walked about a mile from the aircraft and relieved my aching bladder my bags are waiting for me. Idling around the conveyor alone.
Apart from listening to a string of actually quite useful presentations I’ve mostly been eating and drinking.
Every corporate event I’ve ever been to has the most epic volumes of food, as if having a rumbling stomach will reduce the delegates focus. Personally I find the exact opposite. Comfortably sated I relax into a torpor and daydream. Mostly about boats. Having various views of Mary Alice as my laptop screensaver doesn’t help either.
This week’s dreams are about reefing pennants, in particular if and how it would be possible to keep the third reef permanently reeved.  The main problem is the sheer amount of rope required to go from boom to reef and back. There is no way of adding a tackle to this piece of rope that will contain enough movement to complete this tightening action.

Here is a drawing of the current setup with the first reef indicated only…

reefing lines

The tackle is two blocks, one with a becket and the other suspended off the cleat via a short length of line.

Here is the setup reefed…

reefing lines reefed

The pennant has to pull down twice the length of rope from boom end to reef point as it goes up the far side of the sail and back down to the bee block (or piece of wood with sheave in it that turns the rope along the boom). So with a 3:1 tackle, and a 2:1 as normal from boom to sail and back, the force generated by the system can be quite substantial, although a lot of friction is generated at the cringle (metal eye) in the sail.
I really don’t want to use a winch on the boom, so am thinking a releasable tackle to be used on the reefing line with a rolling hitch. Will see what options I have as tightening a correct rolling hitch in ‘ third reef’ conditions on the top of the cabin roof at night probably won’t be much fun. But arguably more fun than trying to reeve it all through the reef point in the same conditions.

Some fresh Acton Town air is the only thing to get on the train at this stop. The platform is deserted.

Why no winches at the mast?
Well for one, cost. Before I started this venture I had a browse though some chandlery catalogues to temper my enthusiasm. That they did effectively. Your average winch suitable for planting to the mast or boom and looking OK would set you back roughly 3 tackles. Given it only gets used every now and again, return on investment is pitiful. A block and tackle is super cheap and simple to use and maintain in comparison, but does have its disadvantages. They are heavier than winches when you need three. And there is miles of rope everywhere. All the time.
Oh and I need three, so almost equal on cost.

Here is a drawing of a concept to simplify the reefing lines…

reefing lines new version

Instead of a block swinging in the breeze attached to the cleat, i’m thinking of using a double cheek block on the boom, and a small jammer to keep the reefing lines organised.

Here is a drawing of the one side of the boom setup completed with two pennants on one side, imagine the same again, but only one, on the other side.

reefing lines reefed new version

This particular problem will have to wait until we sail Mary Alice and find out how often that third reef will be needed. She has 6 tonnes of lead in her keel so should be quite stiff. I suspect sail balance will be the reason we reef early with the third if we ever have to use it. I’m hoping that it is through choice, not necessity. But remembering the 7 ‘P’s, it’s better to be prepared.

Hammersmith, and a few more seats vacate. Also my phone’s battery is suffering a similar fate. Reefing line blog posts will have to wait. However the thoughts continue.