Frames Frames Frames

Had some time this week to do some long evenings after work and make some headway into the frame building.

By the time i got to the second to last frame i had the process down and will post my method in another entry to the blog. All the frames went together perfectly with little cleaning up of the timber required to get a tight fit on all the components. Its not a quick process though, drawing out the frame on the table first took some time until i did a proper baseline and guiding lines to speed up the measurements. I also decided to fill in the slots created by the gussets with some filler pieces to make the look in the boat a bit more professional, but also to ensure a good seal once the couple of sealing costs of epoxy go on. I also rounded over (with a router) the inside faces of solid wood parts and also the gussets where there are not going to be other panels attached. Once the frame was completed i then sanded the various areas that had filler applied (screw holes, various bits around the gussets etc) – which takes time gievn both sides of the frame need this, so means another wait for the filler to go off before sanding. Space in the garage was really the blocker to speed, i can only fit one frame on the bench and so each one needed to be completed at a time, rather than doing all processes to all frames at once which would be way more time efficient.