New crew visits in Oban

My step brother and Clare’s sister came to visit for two different weeks when the weather was doing its best to dampen spirits all around the Oban district, even though the weather didn;t play fair, we had a great time, and even saw some sunshine towards the end of the two weeks of drizzle! 

The Route:

Oban

Loch Spelve – loads of fish farms, quite gusty

Loch Aline – good shelter, good holding, loads of room, lovely surroundings

Tobermory – terrible fish and chips, expensive mooring (£20) expensive showers (£2 for 7 minutes)

Loch Drumbuie via Ardnamurchan point (?!) – lovely loch, beautiful surroundings

Oban – Oban Marina – reasonable cost per night, reasonable shower costs (£1 for 7 minutes)

Pholdobhrain – busy, but very pretty and well sheltered anchorage near Oban

Dunstaffenage – amazing free showers, the most labarynthine pontoons known to man, very friendly staff.

Just north of Port Appin (Linnhe Marine moorings) – hideously expensive for an exposed mooring of dubious quality (£15 per night – 50% more than the pilot states – so 50% increase in cost in 4 years) Free shower, but only one available.

Port Ramsay, Lismore – lovely anchorage, deserted.

Oban

 

Kyles of Bute to Oban

Right – I’m going to try somehting a bit different with the blog posts and the photos. I’ll outline our route, and then the photos are in a slideshow underneath with descriptions for each one as a kind of narrative. It takes some time to load with my mobile phone internet connection so not sure how it will work with regular broadband… I hope this works better to read, as its certainly a lot easier to post.

 

The route:

Portavadie Marina

Crinan Canal

Crinan Canal (Crinan Basin)

Craighouse, Jura

Ardmore Islands, Islay

Inner Loch Tarbert, Jura

Pholdohbrain, nr Oban

Oban.

 

Quick photo post

Here is a panorama of the the Lynn of Lorne or whatever it is outside Oban the other night. Quite amazing light. Click the thumbnail to load the full image…

 

 

 

Largs to Kyles of Bute

We arrived in Largs a day after being in Lamlash as my dad needed to get the train back to the south. Largs is a particularly unlovely location, but the marina itself is ideal for some maintenance, having everything you might need and friendly staff to boot.
We took the gaff jaws off and sent them for some welding as the throat halyard attachment had started to threaten to pull through the gaff itself and was very wobbly. The sail was also still to tall, so the sailmakers cut it down by another 30cm and it now fits perfectly.
The weather was perfect, so i also took apart the heater that had broken a few weeks before. It was full of soot, caused I think by some watery and bad quality diesel from Mylor many moons ago. I cleaned it as best i could, but it still refused to start, it will have to be stripped down again…
After some days of relaxing and boat fixing we set off for the Kyles of Bute, but not before stopping in Loch Striven for the night. The pilot is pretty negative about this place, as it is steep to almost everywhere. We finally found some good holding off a burn near Ardbeg point, and had a lovely night in perfect seculsion.
The following day was the opposite, with most of western scotland heading our way.
We sailed up the loch, which gets narrower and narrower, until eventually we crossed in front of a ferry, then up the very tight, rocky channel past the burnt isles, tacking all the way. In hind sight, this may have been somewhat foolhardy, but it went without a hitch and we soon arrives at the Kyles of bute along with 500 other yachts in the sun. After an afternoon of lazing about on deck, we anchored for the night in the ominously titled Wreck bay, which proved a good move as the wind got up that night and some of our neighbours were forced to leave after I presume they dragged towards the shore. We sat rock steady on the anchor and have a lazy breakfast before heading onwards towards Portavadie, just as the rain started to fall…

Arklow to Scotland

We left Arklow, turned left and headed up towards Dublin. The weather was good and the passage quite fast.
Dublin (well, DunLoaghaire) was a large, organised, well provided for Marina, in a very busy harbour. It was fun to see sailing races of all types going on, including some kind of one designs being launched from the rather poncey looking yacht club.
After an excellent indian we retired for the night and headed onto Ardglass the following morning. This 60+ NM passage cut off a big corner of the irish coast and we arrived in Ardglass (Northern Ireland) in the evening after being chased by some very wet rain squalls all day. Ardglass was lovely. Quiet, sheltered and with a good fishermans chandlery that sold paraffin and meths (we could have hot drinks again).
The following day we headed to Bangor, there was no wind, and lots of sunshine. A long motor, but the sun made up for it. Bangor was a very commercial marina compared to Ardglass, but again facilities were excellent. We filled up with fuel (horrible process, the diesel at the pumps was basically foam and we ended up with a lot on the decks).
The passage from Bangor to Stranraer is directly across the North Channel and this notorious stretch of water was placid and well behaved all day. We stopped for the night in Lady bay, being rocked to sleep by the wash of passing ferries, but not before we saw our first Eider Ducks!
The following day we rocketed due north past Ailsa Craig, and pulled into Lamlash on Arran at about 17:00. This anchorage is beautiful, and entertainment was provided by the yachts of the Scottish 3 peaks race picking up and dropping off their runners and arriving and departing at all times in the night, before they headed for the finish and very well earned beer at Troon.

Newlyn to Arklow

The weather was pretty rough for the first day’s sail to Newlyn – the wind was fairly moderate, but the sea state was quite interesting in Falmouth bay.
There was some kind of wind over tide situation that we’ve never seen before and the waves were square. After about an hour hacking across it, some of the crew succumed to seasickness and so we decided to not press on round the Lizard, and instead go again tomorrow.
We turned back to St Mawes (the wind was from the east, and St Mawes is good for this wind direction) and dropped anchor next to a lovely newly built pilot cutter called Freya.
After a comfortable night at anchor (the Rocna anchor is worth every penny) we set off again in very little wind towards Newlyn.
The sea was a glassy millpond and we ended up motoring for a significant portion of the passage.
Arrival in Newlyn was similar to last year, not entirely sure who to call (although someone did at least pick up the phone) but we got ticked off for not radioing as we entered… last year they didn’t pick up either radio or phone!
The harbour was busy, i didn’t realise, but the pilot thinks it is one the UK’s busiest fishing ports. I can believe it, although it shows how small an industry fishing actually is.
Instead of staying a few days in the Scillies (the original plan) the weather didn’t look too great later in the week when we were planning to head to Ireland, so the following day we simply set off to head straight there.
The beat out to Lands End was pretty standard (timed to get us there on the north going flood), but the sea state off lands end itself was quite interesting, and until we got quite far north of the point it was quite lumpy – all seasickness was being handled pretty well by the liberal use of Stugeron or Quells!
Once clear of the TSS, we set the wind vane and with two reefs in the main, the staysail and medium jib we charged across the bristol channel at about 6.5-7 knots. Just before it got dark we reduced sail to just headsails, we were still doing about 6 knots ish.
Night was only 7 hours long, and apart from an encounter with a fishing boat doing apparently random circles, but always ending up on a collision course at about midnight it was uneventful.
We passed the Smalls TSS at first light, and the stream of tankers and cargo ships was gladly left behind.
The Tuskar TSS was the next waypoint, and shortly afterwards the long plod up towards Arklow.
The waves by this time were getting pretty interesting, we had a bit too much sail up after increasing the sail area in the morning, so we took down the main and the jib then jammed open. After some time fighting it onto the foredeck we ran downwind with staysail and motor to get to Arklow before dark. Surfing a 13 ton boat down very steep wind-over-tide waves with a heavy tiller is not a great experience if you are quite tired.
The tide was also pushing us backwards at about 2-3knots, so the last 15 miles took about 4 to 5 hours in the end.
Entering Arklow harbour mouth in a strong southerly with a breaking sea was pretty interesting (by which i mean terrifying if you are sleep deprived) and getting inside took a lot of engine revs and some quite sudden course changes to counter the waves and tide!
Inside all was calm however and we tied up to the pontoon in the river and I slept like a log for about 11 hours.

Stern gland problems…

The boat went back into the water and I almost immediately discovered a problem with the stern gland, It got very hot, and I couldn’t get any water to leak out of it (as it is designed to do, in order to lubricate it). The stuffing box was made by Vetus, and didn’t have enough thread to tighten successfully with the correct number of packing rings (I used the kit supplied by vetus for that product) and when tightened with the correct amount of thread engaged on the packing nut it was simply too tight and got hot. Pretty basic engineering problems for a ‘proper’ marine engineering company’s product.

I’d had enough of messing around with products made by those purveyors of absolute rubbish marine products, so I bought a PSS (Packless Sealing System) made in the USA. We dried the boat out and fitted it in a few hours.

The PSS kit is brilliant. Complete with even a tiny tube of loctite it went on very smoothly and has worked a charm since.

My advice form this stressful episode? Never, ever, buy anything made by Vetus again. They simply do not make good enough products to be worth considering. Also the flax packing stuffing box? This tech was superceded in vicotrian times. Why the hell is it used nowadays i have no idea.

 

While the boat was dried out, we took the opportunity to remove the rudder, file down the rudder hinge pins and make the rudder a lot looser. Also I glassed in a piece of wood nearer to the prop to make the prop wash more effective when manouvering. Something that I have been meaning to do for ages!

I added some treadmaster on the companionway steps, changed a block that had worn through with poor rope angles and fit some new wooden blocks made by my dad and the jobs were completed!

 

Disaster!

Almost forgot to tell you about this – I’ve blanked it from my mind it was fairly unpleasant.

I was fitting the new bottom rudder hinge (with a hammer mind you) and the middle one fell apart…

Leaving the rudder hanging on by just the top one.

Which was awkward.

So, instead of simply fitting the new hinge and dropping the boat into the water, I had to remove the rudder entirely (its pretty heavy – about 100kgs I’d guess) and remove the middle one to get it rewelded.

The hinge was buried beneath two wooden ‘cheeks’ on either side of the rudder, so I had to remove one of these to get to the bolt heads. By chance I got the correct side first, but it was a few hours of sweating and swearing before it was finally off and the hinge released.

Once it was off, I took it to Seaweld in the yard and they did a proper job on it in a few hours – thanks Sandy! 

Refitting was the reverse of removal (as per Haynes Manual), but still took many hours.

Once back on the rudder was a bit stiff, but at least it was back on and we were back on track…

Rewire

Not much to say about this, but as the last bit of work on the boat, I’m going to tell you about it anyway! I rewired the whole boat with proper marine grade wire, and added the generally accepted minimum requirement of fuses for all electrical items!

The original wiring seemed to have been added piecemeal, and without much regard to the consequences of short circuits and the like.

I added proper distribution bus bars, shore power, new switch panels and circuit breakers where required, and replaced all the old domestic grade wire with proper tinned wire to resist the progression of corrosion evident in the existing stuff.

It took a week, but was worth it – everything is 100% protected from short circuits and looks and feels a lot more reliable than the rats nest of wires originally in place.

 

Bow Thruster install – almost done with boat yard action now…

Being long keeled, Mary Alice is a pain to maneuver. And as such, the worst part of any trip is the getting into and out of a marina, or tight river full of moorings.

She has a turning circle like a super tanker, and when being washed down-tide while trying to turn around, nerves start to jangle somewhat.

To counter this I settled on a bow thruster. Then I found out how much they are to get professionally installed.

Once I had done some reading however, it all seemed pretty straightforward, so I set about doing some research into which one I needed, and whether it would fit in the boat sensibly.

In the end I settled for a Lewmar TT180 5Kw and its position would be in the bow locker right forward under the V berth, where the tunnel could be quite short and the depth of the hull was great enough to place it very low down. I could also site the battery in one of the smaller lockers there too.

Once I had all the bits in the yard, it took me some time to garner the required courage to drill holes in the hull and cut out the massive 180mm diameter hole required for the tunnel.

However once I got going, it was all pretty easy – if disgustingly smelly, dusty and awkward work.

First I cut out the hole (marked as indicated in the Lewmar instructions with a pilot hole and piece of bent wire) with a jigsaw (4x blades required!) then ground the edges down with a mortar chaser tool in an angle grinder to make the hole the right size.

Then once the tunnel was in place I glassed it in place with a load of filler, with added chopped strands to give it some strength and added fillets to the inside surfaces. The outside got the same treatment, but also some patches of glass cloth.

Once the filler was tacky, I set about with strips of glass cloth, then CSM, then more glass cloth and CSM, then a final layer of cloth to build up the join between hull and tunnel. The laminating was in many ways the easy part, keying up the tunnel and hull was done prior to the glassing with an angle grinder and flap sander disc and was very awkward to avoid covering everything in dust and still getting enough material off.

The laminating under the tunnel was awkward, as I had to hang upside down in the locker using a mirror to do the pieces under the tunnel. It all went in eventually however and looks plenty strong enough.

The outside was then trimmed, faired and painted with topcoat. More topcoat was also applied to the inside once completed.

All that remained then was to fit the gearbox (pretty easy following the excellent Lewmar instructions) and bolt up the motor saddle and motor.

The whole operation from marking out to having a fitted motor was 2 long days.

That was only about half the work through, as the electrics is a big part of any bow thruster install – this one draws 500 amps at startup so required some monster cables and a battery up forward, with a battery to battery charger between the domestic bank and the bow thruster battery.

The more difficult bit was making terminals in the 95mm2 cross section cable, but with a hydraulic crimper bought from Amazon, this went ok.

The battery charging cables ran along next to the existing windlass cables, so pulling these was easy.

Again, probably about 2 days work in all, then some minor tweaking bits, like making a remote control for the cockpit (there is no good place to site the control panel) and it was all done.

It works a treat, the powerful 5kw version was the one to go for, the boat pivots nicely when required, and the thruster can be used along with usual rudder and power to spin the boat tightly in a small space or round a tight marina corner.