Frame D1

This is the big one, it actually requires some joinery. It also supports the compression loads of the mast, so should probably be done right.

After ripping down some more douglas fir and thicknessing it, was time to laminate up the top cross piece and the uprights. I then thicknessed the glued up laminations to the correct dimensions (using a sled I knocked up from some 18mm ply to ensure I get actually square profiles – it makes the thicknesser into a kind of crap jointer). After cutting to size I then shaped the cross piece with lap joints to the uprights (using a jig for the router and a sacrifical piece to avoid splintering the edge of the material) and small mortice and tenon joints to the oak floor (didn’t want to remove too much material from the floor itself).

The deck support pieces of the frame aren’t a great design, they don’t tie into the main laminated cross piece if you follow the plans. I extended the cross piece to allow me to provide support to the ends of these pieces so they have a better mechanical mounting.

The rest of the frame is pretty much the same as the other ones, with the added advantage of being able to use the edge of the plywood to line up the pieces.

This was actually quite a big job to do this frame, at least 6 cups of tea.