Rockabye liferaft

The liferaft has been sitting in the cabin for the last few months since I bought it. It takes up loads of space, is almost impossible to move without slipping a disc and would be next to pointless in an emergency.

Not having anywhere sensible to store it in the cockpit either I decided to fit it to the deck, immediately abaft the mast, and in front of the skylight hatch.

To stop if falling off the deck it needed a cradle, but the only ones available for sale are either stainless tubing types, the kind you might see gracing the deck of a newly delivered ‘UpYours 39’ in the Hamble (with price tag to match) or some kind of basic GRP wedges that look a bit like they were designed as bathroom fittings in the mid 80s. Neither of these I was happy to part company with considerable amounts of cash for.

Instead I bought some Iroko, took a template of the liferaft base, made a cradle and screwed it to the deck. Total cost including varnish was about £50.

Without a proper workshop, cutting the pieces was a bit of a mission, but using a hole saw for the major inside corners and a jigsaw for the rest, the result was ok. My joints aren’t perfect, but then it is only holding the liferaft to the deck and many more hours could have disappeared into this.

The cradle is screwed into the deck in 4 places, Sikaflexed into place  with some more black Sika over the tops of the recessed screw holes to completely seal it from the elements.

I also created a kind of shower cap for the liferaft while doing the staysail bag, which is simply a canvas cover with elasticated bottom that simply slips over the top. Once the pelican clip from the straps is hooked into place the raft is completely secure. Removal is simply letting the pelican clip fall open by sliding a metal ring upwards, pulling off the canvas cover and lifting the raft off the cradle.

The Iroko is a good match for the existing exterior woodwork – it has 4 coats of yacht varnish on it and it ‘disappears’ nicely into the rest of the boat…

Not having to risk a hernia every time I needed to move the liferaft around when it was below is complete luxury.

 

 

Staysail body bag

So the staysail is of the hanked-on type – not on a roller reef system.

I’ve been thinking long and hard about this sail for a while. Do I get a roller reefing system and get the hanks cut off and a bolt rope fitted to the staysail so it will fit the furler? This would allow reefing the staysail from the cockpit, without having to go up to the foredeck to fiddle with the sail. It would also allow it to be rolled up quickly out of the way when anchoring/ picking up a mooring etc.

I think I’ve been spoilt by the plastic cruising yachts I’ve sailed, as every single one has had a roller furling genoa. When reefed these genoas never look right, and add a lot to the heel of the yacht, and minimal forward power, but it is convenient.

The hanked on staysail however doesn’t even have the facility to reef, and it ends up being a mass of canvas on the foredeck when it is dropped. Also they just sit there looking untidy and getting baked by the sun or soaked through if they are left out on the deck wrapped up with only a sail tie for security.

So I did a bit of googling and the staysail bag idea seems pretty common. Essentially it’s a sack that the staysail sits in at night and is attached around the forestay to keep it in place. The staysail halyard clips to the tail end of the bag to lift it up off the deck for jobs involving the anchor or moorings.

The best ones will be super simple to get the sail into and will not require the sheets to be unbent off the sail.

These bags are pretty much always bespoke if you want the easy to use type, and instead of having one made, I thought I’d give it a go.

 

I only have an uber-cheap sewing machine I bought on Amazon for £45 – and was a bit afraid it wouldn’t be up to the job, but I have been pleasantly surprised by its performance.

The materials I’ve used all came from ProFabrics in the UK. I have some mesh, PU coated canvas and various 25mm webbing and clips etc.

The mesh is for a panel in the base of the bag to let water out, and the clips are for the forestay attachment. I also bought some continuous chain zip by the meter to make a zip closure on the top of the bag. This should allow me to unzip the bag into an almost flat sheet, while it is still clipped onto the deck, dump the sail into the bag, zip it up and let the sheets exit from under the zip. Connect the halyard to the lift point and haul it off the deck.

Well, that’s the idea – remains to be seen if it actually works…

 

I started by using a small table to simulate the front of the sail – where all the flakes end up as the hanks slide down the stay. This creates a fairly square package – conveniently about the size of an Ikea coffee table.

I measured up a taper that was pure quesswork – the sail will hopefully fit into this… I then cut the canvas into two wedges to make the taper, and added a piece of mesh strip between them to make the ventilation section.

I cut out a square section from this as the stem of the boat is quite square and the forestay attaches to the top of the square edged stem. This cut out was edged with some 25mm nylon webbing for abrasion resistance. I also added a triangular plastic ring to fasten the bag to the deck/ bowsprit in the future.

I then cut the side panels – which were exactly half the width of the fabric. So a simple fold, mark, cut to make them. I sewed the zip into the side panels while they were separate to make things easier.

Once the side panels were sewn on, I measured the total width of the narrow end (opposite the forestay end) and made a circle of fabric with the correct circumference that matched the width. Sewing this into place was a complete mission. The heavy fabric, the need to fold it up as it gets sewn and the tiny sewing machine all did not help. I also added a suspension loop into this edge while the circle was being sewn on.

The front end panels were measured off the coffee table… then sewn on, having first hemmed the bare edge. I had forgotten to do the clips at this point, so had to sew them on with the front panels attached to the rest of the bag. So incredibly awkward, but they went on ok.

I added a second suspension point halfway along the bag to help hold it off the deck as it is quite long and will sag in the middle!

The final step was to finish the zip – I didn’t have a proper zip starting box to bring both parts of the zip together, so made a system with webbing that allows this to happen. The zip has to separate completely so the sheets can exit from the back of the bag without having to undo them.

 

The end result is pretty basic, but I think it will work. The main thing is that the sail is out of the elements when not in use, and doesn’t have to come down below decks to get some protection. We can now leave the jib on its furler, the staysail in its bag, supported off the deck for anchoring, and the mainsail under the regular sail cover.  Should make things a bit easier!

 

 

Aluminium frustration

I’ve previously mentioned that i got some new self steering brackets machined by Lomach machining in Par. Turns out that was the easy part of the fix for the self steering…

Getting the old ones out was a real mission. 10 years of corrosion and salt had fastened them into the ends of the tubing incredibly well. The stainless bolts were difficult to remove as galvanic corrosion (i think) had ensured that they were covered in a fine white powder that glued itself to both metals. Eventually these bolts were driven out through a combination of brute force and the combined efforts of me and my father in law.

The casting then still wouldn’t move, and lacking proper tools, the worst one was subjected to some heat/ cool treatment on the stove, repeated hammering, spannering, cursing directed at it and its relatives, and finally the cordless drill and a hacksaw blade.

By the time we’d finished, the aluminium head had been sawn off, a slot drilled into the remaining plug, and the hacksaw blade inserted and the plug sawn in half. This whole process probably took the best part of 2.5 hours and a flat drill battery. Finally, with the help of the M20 stainless threaded rod that holds on the yacht legs as a drift down the inside of the tubing the plug gave up and fell onto the cabin sole.

By this time we were all a bit tired and the actual mounting of the unit to the transom will have to wait until next time.

 

Rotting lockers

The cockpit locker is next on my list of stuff to do – the exposed edge of the plywood has obviously had some kind of varnish originally, but that seems to have cracked and now the rainwater has crept into the cores of the wood.  Ideally I’d replace the entire plywood panel, but frankly I now just want to go sailing. When I’m next on the boat I’m going to pour some epoxy laminating resin (super thin stuff) into the rotten section, let it harden and then apply wood filler over the top. Then once this has been faired I’ll glassfibre the top section all the way around the locker lip, including the drainage channels, effectively providing a skin over the wood. it should last a few more years like this without need for major surgery.

 

One other bug bear that I have fixed recently is the lack of places to attach fenders. There were the scuppers, but tying the fender lines around these and the toe rail was a pain and very slow – sailing only two-up means that something like preparing to come alongside takes a lot of time, and I’m all about efficiency (15 years as an industrial engineer has drummed this into me and now i find it difficult not to think like this!).

I have fitted some rather smart bronze eyelets to the gunwhales that the fenders can be tied to – but in order to make this job even easier I’ve attached karabiners to the fenders with two loops tied into the fender lines. one loop drops the fender to the waterline – for pontoons, the other loop keeps the fender at gunwhale height – for coming alongside quays and other boats. Simples.

 

Word of warning about bronze stuff though – maybe everyone else knows this already, but I didn’t. Cast bronze stuff seems pretty solid, but bronze screws are as strong as frozen butter. I sheared off two in the process of attaching the eyes. Careful pilot hole drilling and then larger counterboring for the unthreaded section of the screws was needed for every hole to be able to make them work in the GRP gunwhale. This was time consuming and nerve-wracking – not knowing if the screw would shear off or not – for all 32 holes…

 

 

Paraffin escape attempt

The stove didn’t work perfectly even after its thorough clean. On the boat the other week I discovered why – the flexible hose leading from the hard pipework to the stove had a stainless steel outer layer, but the rubber core had perished. Blissfully unaware I was making cups of tea thinking the stove was using a lot of fuel, when actually it was dribbling a lot of paraffin into the locker below the stove. Constantly.

I lifted the locker lid, actually looking for the depth sounder, but was confronted by the heady aroma of blige and paraffin.

A replacement hose was almost £55 after postage – and given that the last one has lasted only ten years is a bit annoying. However, once the new hose was connected the stove is like a new machine. It lights easier, it is more controllable (think this is mainly as it is not getting aerated fuel any more), it hardly uses any paraffin too….

That just left the task of emptying the locker with a sponge and bucket – luckily the paraffin was pretty much reusable, being almost as well settled as a fresh can and being filtered effectively by the sponge. After a few smelly minutes and some very greasy hands, the locker was empty, the tank was full and a cup of tea on the go…

 

 

Metal bashing

The chimney flue protector stainless arrived from the laser cutters and I got around to folding it up and riveting it together…

Its always a bit un-nerving getting stuff back like this, when the last time you saw it was a series of lines and curves on a computer screen as opposed to a physical thing. The chances of having made a monumental cock up on the dimensions or even just designing a part that is physically impossible to make (been there a couple of times…) are quite possible.

This however, went together perfectly. The lazy bend ‘stitching’ looks a bit shonky, but the other option of getting someone to form it was hideously expensive. Hopefully the eye will be drawn by the little Mary Alice on the front…

I bent the stainless along the lazy bends between two pieces of wood clamped up tight. It was hard work keeping a secondary bend out of the flat surfaces and I didn’t quite achieve a perfect finish (the front face has a very slight curve to it), but it is ok for me considering I don’t have a press or a metal folder. I think working literally in the middle of an industrial sheet metal shop for 2 years as an industrial engineer has made me a bit picky about things like this.

The brackets that hold the whole thing together riveted up nicely and the forms were the perfect offset to pull in the sides perfectly square. All in all, not bad for £55 of laser cutting with material included as well.

 

Print me tidy

So inevitably I ended up nerding out with more things to make for the boat while at home in between being in the Czech Republic and the UK during the week.

Travel like this pretty much screws up any chance of having a routine – being at home at the weekend becomes a real luxury – not having to think about where I am supposed to be or what project I need to work on that day. Just simply being at home with a cup of tea and the 3D printer humming away is a good antidote to the rush-wait-rush of air travel around Europe.

I drew some rope tidies like these ones and printed a few out ready to attach inside the cockpit lockers. Mine attach with two screws, not just one (as per the Barton ones) to stop them spinning around – and it just so happened that I had some glow in the dark filament in the 3D printer, so mine will be visible in a dark locker… or not actually – as they need light to activate the chemical reaction in order to make them glow in the first place. Never mind – they will tidy the ropes nicely though once I get around to fitting them…

As the part i drew had big overhangs for the ‘hook’ bit and the area where the rope will sit before exiting out of the bottom I had to print the part with ‘support’ material as well in order that the filament was capable of managing the overhangs. It is a light 3D mesh of filament that bridges the voids caused by the gaps under the part. Whoever designed the program that figures out the density and placement of the support is a true genius – it snaps off cleanly and tidies up simply with a craft knife and light sand down.

I love the 3D printer for stuff like this. You can design a part on the computer and an hour later be able to evaluate whether what you have designed is actually going to work/ fit your requirement/ be ergonomic etc etc. I plan to experiment more with this on the other boat stuff as 3D printed patterns can be used to sand cast bronze for fittings etc…

 

Some drawing.

So the Autosteer is legless. The yard somehow managed to crack two castings that were rather shoddy anyway so i needed to get some more to fasten its legs back to the transom. However, Autosteer units are no longer made. Originally they were made by a small company in Cornwall, but they now seem to have fallen off the web entirely – so therefor must have ceased to exist. Ever.

I took one of the half decent castings back home with me and drew a few technical drawings of the brackets and pin thing and sent them to about 10 machinists I found online. 5 replied, and only one was reasonably priced. Lomach, near Fowey could make the parts in two weeks and also offered to post them to me. The prices were very good – mainly due to the fact that Lee (Lee Osbourne Machining – geddit?) CNCs everything that he can – so essentially leaves the machine to run itself once he’s programmed it.

If I’d known this I wouldn’t have done the technical drawing and would have provided the solid model – but hey, I know for next time…

Finally – sailing.

Went down to the boat last month. She’s been in the shed for 11 weeks. Originally the yard quoted 3 weeks for the work – like everything they do, their estimates on time were woefully inaccurate – also represented in the way they quote for the work unfortunately.

However, I absolutely cannot fault the quality of the workmanship. The deck looks lovely, faired to within an inch of its life, antislip looks great and is rough without being knee worryingly so. The spars that were varnished (bowsprit) and repaired (gaff) and repaired and varnished (mast at the shroud cheeks) are gleaming under 7 coats of varnish.

The new bilge pumps have been installed on stainless brackets so it is humanly possible to extract them without needing double jointed elbows and the anchor windlass looks, well, like a windlass should.

 

We spent a few days re-rigging the boat. The riggers dropped the mast in and half heartedly tightened the standing rigging – admitting that ‘they didn’t have much experience’ of gaff rigs – not quite what they said when they whipped the mast out last year. I had to re-tension the rig and re-fit the topping lifts, pin rails and other stuff that they removed last year. They also twisted up the bobstay tensioner, and didn’t seize any shackles. At all. Not even one. They also didn’t reconnect the masthead lights or VHF wiring. Also, considering they took the mast out, they also didn’t replace the wedge that they say was missing – come on – a wooden wedge. It would be possible to knock one up in 5 minutes and do a ‘proper job’. That though, is apparently my problem.

Basically – the riggers put the stick in the boat. That’s about it. £259 for putting a mast in a boat is a lot. Fairly sure that I’m not the only person who will think this isn’t great value.

 

Still, frustrations aside, the weather was good for the first few days and the boat started to look more like she should. I bent on the mainsail, and did a trial hoist – turned out the gaff hadn’t been put back together correctly. Where the remedial work to the wood by the jaws had been done (and the saddle taken off) the eyes for the mainsail at the throat and the eye for the throat halyard had been put back in the wrong positions and the gaff then jammed on the way up and down due to the throat halyard forcing the gaff into the mast. Once the eye had been repositioned (to where it was originally, before the work) it ran smoothly – aided by a coat of dubbin* on the leather as it was very dry.

Also on the receiving end of the dubbin was the bowsprit traveller – this also had the outhaul replaced and I serviced the furler – which seemed to contain a mixture of grease, leaf mould and salt crystals when i opened up the thrust bearing. A brief interlude with a can of WD40 and a roll of kitchen towel int eh marina car park later, the bearings were clean and i repacked it with grease and it is like a new part now. I still need to do the same to the head swivel, which i suspect is in a similar state…

 

*dubbin – technically I’m sure i should have used some sheep based product – lanolin or something, but at 17 quid a tub that seemed a bit steep for some sheep extract.

 

We went for a sail once the boat was ready – and it was perfect. Force 4-5, put a reef in the main (more on this later) and experimented with the staysail and jib combos. We had the small jib up, the boat was ok, but not perfectly balanced, then the staysail as well, and she settled down, but was overpowered in the gusts, and tended to fight the helm. I think the main, being so long and low, will need reefing fairly early to maintain some kind of balance.

Once we were back at the pontoon i raked the mast forward a bit to try to help the weather helm and also reconfigured the topping lifts as they are a bit short. They are still a bit short even after the fiddling and i intend to replace the ropes and lengthen them a bit. They are also attached to the lazyjacks and this might explain why they are so heavy, as i think the lazy jacks are taking a lot of the load of the boom, from halfway along its length, giving very little leverage to lift it up effectively.

 

Work below decks included locker cleaning and deck head wiping by my wife (horrible job, but amazing difference) a mixture of minor mould growth and paraffin smoke stains came away by the cloth load.

I fitted a split charger (a Mastervolt 10a unit) that, once connected to the mobile mains kit charges the house and engine batteries when plugged in. This way we have a kind of hacky shore power and can run all the 12v stuff without worrying about the battery life. Not ideal, but cheap (about £150 all in) instead of a proper shore power setup that might go in next year.

Also attached to the rats next of wires (must do a proper bus bar job soon) was a solar regulator – this will stop the batteries being overcharged by the small solar panel we have (for battery maintenance really, not heavy use). The PV panel kicks out 17v at peak output and the regulator steadies this at 14volts for the batteries, it also controls the charge cycle. It is not super critical with the small panel we have – i suspect it never makes it to 17v –  but better safe than sorry for the sake of £20.

 

Other general tasks on deck included fitting some fender attachment points – as Mary Alice doesn’t have safety lines, we are a bit limited on where to tie fenders. I bought 8 bronze eyes from Classic Marine, complete with bronze screws. The bronze screws were a mistake. They have the structural integrity of overcooked spaghetti. Once I’d sheared one off, I learned my lesson and the rest went in ok, but it started raining while kneeling in the scuppers and i called it a day having fitted 5. Some more grovelling in the scuppers still to do.

The last of the jobs done was a bit of miscellaneous Sikaflex sealing of some leaks above the pilot berth (cracked caulking i think) and round the main hatch/ light above the saloon. Nothing serious, just annoying. Most of the boat is 100% waterproof though, which is somewhat unusual i think for a home built one!

 

 

ah..

Got an email from the yard. Turns out the self steering bracket fell off.

I mean the whole assembly.

It’s an AutoSteer unit from a company in Cornwall. Most of it looks ok, but the quality of the aluminium castings is horrible.

I used to work for a company that produced (amongst lots of other things) aluminium explosion-proof call points for oil rigs. We got a batch of castings from the foundry that looked like they were made of Wheetabix. Somehow the paint shop managed to make the powder coat stick for about 30 seconds while we inspected them. I learned a lot from the cheif industrial engineer at the time.

The horrible texture of the castings were what happened with a ‘cold shut’ he explained. The molten aluminium is let into the die when it is not yet warm enough and as a result it cools irregularly. You end up with flakey, pourus castings with the structural integrity of feta cheese. The second problem is that when the casting goes into the powder coating plant, and once coated in powder goes into the oven, the pores in the casting de-gas and make tiny pinholes in the coating, leading to a powder coat that lasts about a week in hard conditions.

It is possible to make a better powder coat by running the casting through the oven first, before coating, but it still ends up being rubbish eventually.

The castings on the Autosteer unit are obviously fairly poor quality (probably as a result of the process above)  and some have already been replaced. The powder coating is falling off some of the brackets, which makes me think the others that look ok are probably a bit rotten on the inside.

Basically i will need to replace them all. I’ll do a drawing next time i’m at the boat and get some machined up. More expense! – but at least the whole assembly didn’t fall into the harbour!

But basically Mylor Marine Team just made up a story about it falling off. Things don’t just fall off. They knocked it off and decided that they didn’t want to pay for a replacement. Which is a lot like their attitude to most of their work to be honest.