Spring Coat

Got an update from the chaps at the yard that the flowcoat had gone on – some kind of incident had left brush marks in the finish (unfairly this can be called ‘rush marks’) – probably trying to flatten a large batch of polyester to the deck in record time or something… Either way the guys there decided the finish wasn’t good enough so adding some extra and flattened it off, in fact their words were ‘we thought you’d not like a fishing boat finish’. I’ve seen some good looking fishing boats on the Fal though.

It’s now eleven weeks since the boat went into the shed. Which, considering the fact I was told it would take three weeks in total including the coachroof whih we didn’t do (ok so they found some more rotting stuff, but really maybe a couple of weeks extra work at the outside) is getting less surprising with each passing week. Not sure why it is so complicated to make an accurate estimate on the time taken to do a job. Luckily it’s not important that the boat is not in the water – We’ll be just in time for the commissioning sail in mid May!

 

 

Geeeaaarrrppeee.

The GRP is down. Ply finished, deck waterproof. The job looks great – the finish that i can tell from the photos looks nice, the margins where the old and new GRP joins look neat.

The grey finish is just the resin colour, not the final product. There is still flowcoat and grip to be added to this.

It’s fab to see the yacht with the deck back on. Makes her look a little less forlorn.

 

 

Random progress

Quick post as I’m having lunch…

The foredeck glassing has begun…

First layer trimmed to fit…

The calls from the yard about finding more and more rotting plywood have largely stopped now, the hatch cover was the last damp discovery. A new one has been laminated up and fitted to the original frame. Wildlife discovered living in the plywood has been repatriated…

Ply planking

Got a few updates from the yard – loads of progress on the boat! I’ve been traveling around a bit these last few weeks and haven’t had a chance to update the blog. MegaCorp™ seem happy with the last project I’ve done and have moved me onto a load more… More hotels and more planes and trains etc.

 

The cockpit coaming:

The new cockpit coaming has been laminated up and fitted along with a new carlin down the side of the cockpit. The guys at the yard decided to change the way the coaming mounts to the side of the coachroof and have created a stronger join – looks ok too.

 

The deck:

The foredeck ply went down, then I got an update a week and a half later that the rest was almost done. Both layers of the ply are screwed to each other and the deck beams. The underside of the foredeck section has had grooves routed into it to replicate a kind of planked effect. Two layers of 12mm ply should be adequate strength-wise…

 

The coachroof:

The ply around the two portholes where the surveyor found the rot have been uncovered and quantities of a kind of compost removed. Lovely.

New ply will be scarfed into place to repair the sections.

 

 

Chimney Protector Number 1

After about a week of emailing a bunch of drawings around the Yorkshire area (was up north in the UK for a bit) i found a company that would do the laser cutting of the chimney protector bits for a good price – its only a tiny amount of work, so the bigger places weren’t interested – if they bothered to reply at all to my jabbering emails…
The guys at GenFab in Rotherham have a great setup – they make a load of different stuff in their fab shop, explosion proof enclosures, wood burning stoves, rebar fabrications… and they have two laser cutters, one brand new, one a bit older. They cut the pieces of the exterior chimney protector out of some 5mm mild steel in a day or so and I picked them up last Tuesday.
Once cleaned up (they did a fast cut as requested and the parts had some start/stop marks and some burrs, but its nothing that a bit of swift filing and emery paper won’t fix) the parts slotted together perfectly and I tack welded them into position. Being an idiot I didn’t check that all was square from all angles before I final welded them (from most directions it looks ok, from one, it looks like the top ring is on the wonk a bit… duh). Having not welded for a bit, i did most welds twice before I finally decided that enough was enough. It looks ok I think. I shot blasted it to give it some texture and to clean off any left over welding marks.
(This alone took about an hour as getting the flipping shot blaster working was a mission in itself due to having left a load of aggregate in its tubes last time i used it and it set rock hard – i have left it empty this time…)
Once it is galvanised it should be adequate for the boat. Still not sure it’ll look ok though – its definitely a birdcage – but it is surprisingly small so might get lost in the general deck clutter.

Cockpit coaming

Got a call from the boat builders the other day – more rotting plywood was discovered in the cockpit coaming – once this extremely surprising news was digested exactly 2 milliseconds later, the decision was made to cut/scrape it all out and start again with new materials. The yard have replaced some timbers (carlins/carlings ?) that run around the cockpit itself, and formed up some new coaming sides from 6mm ply. They refitted the original top Iroko and will be adding the new winch pillars before the GRP goes on. Can’t fault the workmanship of these guys.

Its been a bit of an interesting journey so far with this boat – i’m amazed how little of this damage and rot was actually picked up by the surveyor – he managed to find the small deck sections and the bits in the coachroof with his tapping hammer thingy. I guess the GRP was so think that it doesn’t necessarily work as a technique on this kind of construction. There must be a better way to find rot than simply by tapping bits and listening to the sounds the part makes. Surely.

In other news I bought a new transducer for the depth/speed. Currently there is only depth via a NASA unit. Via a long winded postal chain its made its way to the yard and it’ll be fitted into the existing cavity before Mary Alice is put in the water. I’ll do the wiring later – its all part of my plan to modernise the instruments a bit…

 

Avoiding the burn

The boat has a full complement of British built ah, comfort, devices – a Blakes Lavac loo, a Taylors paraffin stove, and a Taylors paraffin heater. Having tried them all I can confirm that, at least in the marina, they all work admirably.

 

When we bought the boat I was told a story by the previous owner/ builder.

He had sailed to the Scilly isles, had a good week pottering around with family and was going to sail back to Falmouth single handed. Something about one way being enough for some crew members.

While leaving the anchorage he had the heater on. While he was down below, the boat lurched off a wave and he grabbed the nearest handhold. Once the synapses in his arm jumped into life he realised that he had just grabbed the flue from the heater (it has no guard) and was busy branding his palm.

Immediately resting his hand in a bucket of cold water for the entirety of the journey back (I have no idea how he must have managed sail changes), a single layer of skin completely peeled off his palm in one go some miles off Falmouth and brand new layer of not-too-tender skin was left for him to complete the voyage with.

 

Aiming to avoid this scenario I have designed a heat shield for the heater flue. It needs to let some heat out, but protect stuff from the flue itself. I looked at the Taylors ones available, and while nice, they are hideously expensive and rather short for what we need.

I’ve drawn it up in CAD and it is being laser cut from some 1mm stainless sheet. Not having a press I have used a lazy bend system to make it fold correctly. Certainly not as neat as a proper form, but a lot easier.

The brackets to hold it have tabs to hold it against the flue correctly and stiffening flanges and rivet holes to attach to the guard itself.

 

When rummaging in the cockpit lockers i came across a flattened flue cowl. Completely squished out of all recognition. To avoid this happening again (and mainly to try to avoid burning holes in the sail – which could get expensive) I’ve also designed a guard for the exterior portion of the flue. This is made from 5mm mild steel and I’ll weld it together when i get a chance. Once galvanised it should be man enough for some salt water treatment. Again, the parts are being laser cut by the same blokes in Rotherham, its only tiny, but the laser cutting gives a super neat finish and less time changing blades on the jigsaw.

I’m not too sure about the design of this guard – it looks quite utilitarian (and a lot like a birdcage) but needs to be rope-friendly for hte jib sheets to slide off and also quite robust to take a knocking. I’ll see what it looks like when its in place and make a call then.

Rot Rot Rot

A pretty wallet bruising weekend in the south west. I took a couple of days off from MegaCorp™ and traveled down to the yard. Its a bit of a hike from my dads place down to the boat so i booked us into the Falmouth Hotel. Its a massive pile on the narrowest part of the peninsular. Lovely view, but i got the impression we were about 40 years too young to be there. Maybe when the faculties start deteriorating you stop noticing the ill fitting carpet (gripper rod showing), broken lamp shade, trim falling off all over the bathroom, and the concept of a twin room being two single beds pushed together with two duvets!? The service was excellent however. Still, it worked for a night and we got a lot done…

 

Mary Alice is deckless. Its taken a long time due to the construction – 24mm of ply, 2 layers of 12mm. A thick plastering of CSM and polyester resin all over it all. Lots of trimming away slowly and peeling the sheets of ply off.

 

Having pontificated previously about the need to use epoxy and woven cloth, it won’t now be necessary. The deck is so massive (it could be half the thickness probably) that the strength comes from the ply – the GRP is just waterproofing. For this we can use regular chopped strand mat and the much much cheaper polyester resin. The bond between the ply and glass can be improved by some solid surface prep on the ply.

So, if it wasn’t the cracking polyester, why did the deck leak? The yard reckons it’s simply a case of poorly sealed fittings – all the damage is around areas of high load or poorly fitted items. The area under the bitts, around the portholes and the cockpit area are all rotting – purely due to the water finding its way in between the fittings and the GRP.

 

The guys had started to pull away the damp bits of the ply around the cockpit coaming – the damp has crept in where the GRP meets the Iroko trim. Sure enough we now have to replace all the ply around the cockpit coaming…

 

<sound of cash leaving wallet>

 

It was also pointed out that the winches are held on with a few 8mm bolts and some penny washers… The yard will be adding a rounded ply block under each one and bolting the winches through the new block down to the deck beams. The whole block arrangement will be glassed over to seal it and ‘hide’ it as best possible.

 

<sound of more cash leaving wallet>

 

In other news – I took the Taylors stove out of the boat and spent a very sunny day cleaning it up and polishing it… sure it won’t stay like this for long, but sure looks nice in the interim! It appears to have had almost no hard use and came up well with some cif and a sponge, followed by some metal polish and fine wire wool.

Its been very nice to be actually able to put some sweat into the boat (even if it is just polishing!). I could probably do all the work being done on her, but simply don’t have the time or the job to be able to do it.

 

I also took advantage of the (almost unbelievably) good weather and laid out all the jibs and staysails.

There are two staysails – a working one of very heavy canvas, a light weight (but smaller) high footed one and also a storm jib of minute proportions.

There are three jibs, all with a wire luff and wrapped up, I didn’t unroll them, but they seem to form a nice range of sizes. I’ll have to wait until the mast is back in to truly investigate each one.

More deck stuff

Got some more photos from the boat builders – they’ve discovered that the cockpit coaming is rotting too… yet more damp plywood to replace. This boat is looking pretty sorry for herself right now, but given some more attention she should be back in the water by the spring.

In other news, I ordered a Blakes under deck pump for the heads refit – not much to do in there but make the pipework neater – including a recessed pump location and tucking the pipework behind a locker. Probably live to regret this choice when a takeaway curry gets the better of the plumbing.

Latest deck photos

Managing to keep track of whats happening to the boat while traveling and working gets pretty interesting – so i asked the guys doing the work to keep sending photos as they do the work. I’ve dropped some of the photos into a gallery – here is the progress so far!

The deck is being stripped off one layer at a time, first the GRP, then the two ply layers. I was going to get the coachroof done as it has some small patches of damp, but the majority of the woodwork is still sound, so on advice from the boat builders we are leaving most of it intact. Which is a decision my wallet loves.

MegaCorp™ keeps me pretty busy and doing the boat – even vicariously – keeps me sane. If its all going to shit at work at least i can stop and think about what the the next 18 months or so will be like.

I’m in London this week, the site is next to a tiny riverlet that goes out into the Thames, walking along the heavily polluted river this lunchtime was almost like summer when the sun came out from behind Canary Wharf.The ducks can pretty much walk on the river its so full of crap. Plastic bags, bottles and other rubbish flow in and out on the tide. Pretty grim, but at least its an open space with some skyline.