A pretty wallet bruising weekend in the south west. I took a couple of days off from MegaCorp™ and traveled down to the yard. Its a bit of a hike from my dads place down to the boat so i booked us into the Falmouth Hotel. Its a massive pile on the narrowest part of the peninsular. Lovely view, but i got the impression we were about 40 years too young to be there. Maybe when the faculties start deteriorating you stop noticing the ill fitting carpet (gripper rod showing), broken lamp shade, trim falling off all over the bathroom, and the concept of a twin room being two single beds pushed together with two duvets!? The service was excellent however. Still, it worked for a night and we got a lot done…
Mary Alice is deckless. Its taken a long time due to the construction – 24mm of ply, 2 layers of 12mm. A thick plastering of CSM and polyester resin all over it all. Lots of trimming away slowly and peeling the sheets of ply off.
Having pontificated previously about the need to use epoxy and woven cloth, it won’t now be necessary. The deck is so massive (it could be half the thickness probably) that the strength comes from the ply – the GRP is just waterproofing. For this we can use regular chopped strand mat and the much much cheaper polyester resin. The bond between the ply and glass can be improved by some solid surface prep on the ply.
So, if it wasn’t the cracking polyester, why did the deck leak? The yard reckons it’s simply a case of poorly sealed fittings – all the damage is around areas of high load or poorly fitted items. The area under the bitts, around the portholes and the cockpit area are all rotting – purely due to the water finding its way in between the fittings and the GRP.
The guys had started to pull away the damp bits of the ply around the cockpit coaming – the damp has crept in where the GRP meets the Iroko trim. Sure enough we now have to replace all the ply around the cockpit coaming…
<sound of cash leaving wallet>
It was also pointed out that the winches are held on with a few 8mm bolts and some penny washers… The yard will be adding a rounded ply block under each one and bolting the winches through the new block down to the deck beams. The whole block arrangement will be glassed over to seal it and ‘hide’ it as best possible.
<sound of more cash leaving wallet>
In other news – I took the Taylors stove out of the boat and spent a very sunny day cleaning it up and polishing it… sure it won’t stay like this for long, but sure looks nice in the interim! It appears to have had almost no hard use and came up well with some cif and a sponge, followed by some metal polish and fine wire wool.
Its been very nice to be actually able to put some sweat into the boat (even if it is just polishing!). I could probably do all the work being done on her, but simply don’t have the time or the job to be able to do it.
I also took advantage of the (almost unbelievably) good weather and laid out all the jibs and staysails.
There are two staysails – a working one of very heavy canvas, a light weight (but smaller) high footed one and also a storm jib of minute proportions.
There are three jibs, all with a wire luff and wrapped up, I didn’t unroll them, but they seem to form a nice range of sizes. I’ll have to wait until the mast is back in to truly investigate each one.