DIY Endless line furler

Waaaay back when we were originally sailing Mary Alice shortly after buying her we discovered that the Wykham Martin – style furler for the jibs (out on the end of the bowsprit) didn’t really work very well. I tried servicing it, I tried changing the lead of the halyard etc. But the drum was just too tiny to furl a heavy synthetic canvas sail in anything other than a moderate breeze and the other annoyance was that the amount of turns required for the 3 different sizes of jibs meant that occasionally if you didn’t fully unwind, then prep the drum with a few spare turns before unfurling a sail you’d end up with not enough rope to fully open the sail (the sail would jam half out) or not have enough to fully furl it away again. Either way, as the furler was operating on a wire-luff it is not a roller reef – it only has two states, fully open or fully closed, so being halfway out was pretty disasterous, endangering the sails – and in one memorable case, endangering the whole bowsprit when a half powered up, half opened jib got the wrong side of a serious squall and i was hauling it in hand over hand on the foredeck while the bowsprit bucked and bent in front of my eyes.

The solution to the rope length issue is to use a continuous line approach. i.e. lead a loop of line from the furler back to the cockpit and so that you can pull in either direction indefinitely to furl/ unfurl the sail.

The solution to the leverage issue is to simply make a furler with a larger diameter ‘wheel’. I’m really not sure why this isn’t done anyway for regular roller reefing systens, as they aren’t usually very easy to furl by hand, when they could be with a slightly larger unit.

I looked around for secondhand units, and when nothing came up i then looked at new units. After seeing the price tag of these (£2k+)I quickly became convinced that i could make one for about 25% of the cost.

One of the few advantages of working for MegaCorp is that i got a bunch of useful software licenses, including Solidworks. Using this i drew a furler, and based all the bearings on standard stainless steel types available on Amazon for ease of replacement. The drum was in two halves, made so that i could vary the way the rope was gripped to see which way worked best without any modifications (just bolting it together slightly differently having rotated it 60 degrees using the 6 bolt hole pattern).

The material was aluminium and the central load bearing column was stainless steel. (i.e. the part that takes the tension of the wire luff that becomes a kind of mast stay when the running backstays were tensioned fully). There is a push button pin that allowed for the foot of the sail to be inserted and snapped into place.

I used Lomach machining services again, who incredibly generously did the machining for £480 – which by any stretch was a bargain. The remaining parts were about £50 (bearings on Amazon are cheap!). Every part went together flawlessly and were fastened with some stainless fasteners also supplied by Lomach.

I 3d printed some rope guides and attached these, and then tested the device.

It took a few different rope types and diameters to find one that was just grippy enough, and i had to re-spice the loop each time, but each time i got a bit quicker (the splice is pretty complicated (takes maybe an hour to do when i was getting good at it), as it has to be a constant diameter and made of braid-over-core line).

The result was a really functional furler, super easy to furl due to the large drum and really, really robust. Probably too robust – as it was maybe 2kgs too heavy. If i did it again i’d refine the dimensions of all the parts to make them lighter and perhaps reduce its unnecessarily stong core section. It could also do with some more refinement in the rope guide sectiona s this caused quite a lot of friction and would be easy to remedy with some rollers. All in all though, seemed to work ok and for 25% or so of the cost of a bought one!

Frame D1

This is the big one, it actually requires some joinery. It also supports the compression loads of the mast, so should probably be done right.

After ripping down some more douglas fir and thicknessing it, was time to laminate up the top cross piece and the uprights. I then thicknessed the glued up laminations to the correct dimensions (using a sled I knocked up from some 18mm ply to ensure I get actually square profiles – it makes the thicknesser into a kind of crap jointer). After cutting to size I then shaped the cross piece with lap joints to the uprights (using a jig for the router and a sacrifical piece to avoid splintering the edge of the material) and small mortice and tenon joints to the oak floor (didn’t want to remove too much material from the floor itself).

The deck support pieces of the frame aren’t a great design, they don’t tie into the main laminated cross piece if you follow the plans. I extended the cross piece to allow me to provide support to the ends of these pieces so they have a better mechanical mounting.

The rest of the frame is pretty much the same as the other ones, with the added advantage of being able to use the edge of the plywood to line up the pieces.

This was actually quite a big job to do this frame, at least 6 cups of tea.

Building frames step-by-step

As i’ve mentioned, it took me about 6 frames to get a proper technique down for all the different steps of building a frame. That left me only one frame that i actually did the most efficient way…

Each of the pictures should have a caption below explaining the steps I took – no doubt there is probably a better way of doing this though…

Step 1

Image 1 of 16

Step 1 - Draw out frame on the building board using the plans from Janusz

Frames Frames Frames

Had some time this week to do some long evenings after work and make some headway into the frame building.

By the time i got to the second to last frame i had the process down and will post my method in another entry to the blog. All the frames went together perfectly with little cleaning up of the timber required to get a tight fit on all the components. Its not a quick process though, drawing out the frame on the table first took some time until i did a proper baseline and guiding lines to speed up the measurements. I also decided to fill in the slots created by the gussets with some filler pieces to make the look in the boat a bit more professional, but also to ensure a good seal once the couple of sealing costs of epoxy go on. I also rounded over (with a router) the inside faces of solid wood parts and also the gussets where there are not going to be other panels attached. Once the frame was completed i then sanded the various areas that had filler applied (screw holes, various bits around the gussets etc) – which takes time gievn both sides of the frame need this, so means another wait for the filler to go off before sanding. Space in the garage was really the blocker to speed, i can only fit one frame on the bench and so each one needed to be completed at a time, rather than doing all processes to all frames at once which would be way more time efficient.

Frame E

I started with Frame E as it was the smallest and most managable to get my head around the process. After making sure all the parts matched the drawings (it has a front and back layout that needs to be respected for other parts to fit correctly around the crash box and deck beams) I drew out the frame on the bench top.

I had got 3 old melamine faced desk tops from the same office clearance guys that got the cupboards from. They were busy burning the rest, so they were free, and they made an ideal building/ marking out surface.

Using the drawings in the plans pack from Janusz i created the marks for each stringer centre at the chines and gunwhale. after wrapping the bench in see through plastic i layed out the frame and glued and screwed it together, precisesly on the marks previously made. The act of drilling and screwing the frame initially as a dry fit requires it to be flipped over, allowing a secondary check that the frame is totally symmetrical against the marks.

The Kit

The kit is a pretty nice way to build a boat it seems. There are something like 112 pieces of solid wood and 25 sheets of ply all pre-cut – to do this by hand I’d estimate something like 100 hours of work lofting/ templating or tracing and cutting there alone. Not to mention that it is all going to be pretty much perfectly accurate. Or at least predicatably inaccurate…

Fyne had a few problems with my kit, one of the planks had shifted on the vacuum bed and a few parts had been remade, which they sent on super quickly. The pen lines were also not drawn on (this is a big win if you can get this done by the kit supplier – lining up various parts would potentially be a lot quicker for the sake of a tiny amount of machine time – specifically locating the hull planking when it comes around to that step). I believe Fyne are planning to include this in the future – I have UK kit #1 – so its to be expected that it may not be perfect! Only one part had a knot in it, and after checking this wasn’t in an important area I cut it out and filled it with resin.

To be clear though, you cannot find a friendlier and more helpful bunch of folks than the guys at Fyne. I turned up in a van at their place after a hectic rush from home and they had time to explain everything, advice on resins, tools etc you name it. After slotting the kit into the van with a few mm to spare all that remained was to drive home and unload it into the cow shed. I took the frame parts home for making those in the garage though…

After cutting the solid wood parts out with a jigsaw or the bandsaw i cleaned them up on teh router table with a bearing guided edge trimmer bit. That process took 3-4 hours. There are a lot of parts. But 4 hours to create 112 solid wood parts? – no brainer.

I also picked up some douglas fir rough sawn planks from Fyne for the stringers. I ripped these down on the bandsaw to the sizes required and finished them through the thicknesser (if only i had a jointer…). Somehow though i miscalculated and do not have enough material. Another trip for more planks is in order…

Epoxy tests

Before launching into frame building I did a few tests on the offcuts and scrap from the kit.

The resin is, well, just epoxy resin. The fillers seem to mix well (i have some of what Fyne call ‘microfibres’ and some filleting blend). The microfibres appear to be the equivilant of West Systems 406 i think judging by the old pot of 406 I have in the garage.

I did a few sample joints, one to simulate the frame construction and one to do a fillet pull test.

The frame joint went together fine – wet out coat on all surfaces, then thicken the mix and apply as adhesive, then screw together. I did one with a wet out and one without. For the frame joint this made no difference that i could tell.

However, when i did a couple of tests (not got photos of this, darn) of a 90 degree plywood joint with no mechanical fasteners. The part with no wet-out coat tore off a tiny layer of the outer ply, and came apart pretty easily. The part with a wet out coat held together until the plywood broke. Wet out/saturation coats seem pretty critical.

The Shed

Finding space to build this boat wasn’t straightforward, but i think i’ve found a pretty good deal on a space about 5 mins away from my house.

It is a cow shed.

Not currently containing cows.

It’s got an earth floor and a few power sockets miles away from my allocated bay, but it seems to have worked out ok so far.

I’ve taken a cable from my bay to the power socket by the roller door (about 50m away) and it still appears to be giving a reasonable amount of current as the cable cross section is pretty big (designed for 16a if you must know, mcb on sockets at my end rated at 10a).

Next up was some lighting and I also bought a couple of metal cupboards from an office clearance place for next to nothing to put stuff in.

I’ve started making the strongback from some old pallet rack i picked up cheap – i was going to use timber, but the shed isn’t 100% dry (one massive leak down one wall and puddles in the middle when it rains hard), and what with the earth floor i thought at least the base structure should be warp free where possible. Only stuff touching the floor might be an issue as the air circulates ok (read: draughty…). The frame is perfectly level and welded square so it cannot move.

Just need to make some frames now…

Mini 580 lead bulb

So you’ve started with the keel huh? Yeah, well, while i wait for the plywood/ hardwood kit to get cut, this is something that i can make some headway on.

The drawings call out a series of profiles for the keel and leave the final curves between up to you, but this produces what looks like a pretty simple to model bulb. Using CAD i developed the 3d model, with the intention of 3d printing it, then using the printed model to make a concrete mold to do the pour into.

The cad program allows me to assign a material (lead obvs..) and gives me a mass for the finished part. Thsi shows that the bulb as designed is a little overweight (like me) but can be subsequently shaped to size (probably unlike me) and will also allows for slightly impure lead that will require a bit more volume to meet the weight required by the class rules.

I need to check this is accurate before going any further, but for now looks ok… Concrete next, then some kind of lead purchase, or maybe team effort with the lead supplier to do the pour at their place, rather than invest in a propane torch and big metal pot… we’ll see what looks cheapest!

Keel bulb model